FIELD: oil and gas industry.
SUBSTANCE: group of inventions is related to underground hydrocarbon inflow stimulation and more specifically to devices improving reliability of point stimulation. Essence of inventions: the invention envisaged pumping of liquid through a stimulator, bypassing of at least a part of the liquid through the stimulator, bypassing of at least a part of the liquid from the stimulator to an anchor unit connected to it so that they can communicate. At that the anchor unit includes housing with a movable former and a one-way restrictor movable inside the former. The one-way restrictor inside the former can be placed to the first position in which the restrictor passes a limited amount of the liquid through the housing. The liquid can be also introduced from the anchor unit in order to install a sand plug at the predefined position and to divert the liquid flow in this position by means of a sand plug.
EFFECT: higher efficiency of stimulation and operating reliability of the devices.
19 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING GROOVES IN WELL BOREHOLE CASING | 2011 |
|
RU2570210C2 |
HYDRAULIC IMPACT DEVICE | 2021 |
|
RU2770966C1 |
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION | 2008 |
|
RU2431036C2 |
METHOD AND DEVICE FOR FISSURE CREATION IN UNCASED WELLS | 2002 |
|
RU2318116C2 |
BOREHOLE CLEANING WITH DOWNHOLE PUMPS | 2007 |
|
RU2423600C2 |
METHOD OF HYDRAULIC JET PERFORATION OF WELLS AND DEVICE FOR ITS EMBODIMENT | 2001 |
|
RU2185497C1 |
METHOD FOR WELL FINISHING WITH APPLICATION OF EXPANDABLE TAIL AND ITS FURTHER CEMENTING (VERSIONS) | 2006 |
|
RU2405921C2 |
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING | 2012 |
|
RU2601641C2 |
PROCEDURE, SYSTEM AND DEVICE FOR TEST, TREATMENT AND OPERATION OF MULTI-RESERVOIR WELL | 2007 |
|
RU2417312C2 |
SYSTEM AND METHOD FOR EXTRACTION OF FLUID MEDIUM FROM WELL SHAFT | 2009 |
|
RU2503794C2 |
Authors
Dates
2014-06-27—Published
2010-04-28—Filed