UNIT FOR CONTROLLED DELIVERY OF BOTTOMHOLE TREATMENT FLUID Russian patent published in 2014 - IPC E21B33/13 

Abstract RU 2522368 C2

FIELD: oil and gas industry.

SUBSTANCE: group of inventions is related to tools and a method of the bottomhole treatment fluid delivery to the job site. Essence of the inventions: the unit of the bottomhole treatment fluid delivery to the job site comprises a tubular body for filling the displacement fluid and the bottomhole treatment fluid as a column of the pressure increasing fluid, at that the tubular body is made as a flexible tubing string; an injection valve connected to the end of the above tubular body faced to the bottomhole in order to direct the bottomhole treatment fluid closer to the bottomhole from the displacement fluid; and a back-pressure valve connected to the end of the above injection valve faced to the bottomhole in order to maintain the bottomhole treatment fluid at high pressure before delivery to the job site. At that the back-pressure valve is made so that it excludes premature release of the bottomhole treatment fluid from the unit. The unit can be charged with the bottomhole treatment fluid from the end faced to the bottomhole.

EFFECT: higher efficiency of the method and operating reliability of the device.

21 cl, 7 dwg

Similar patents RU2522368C2

Title Year Author Number
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
DEVICE FOR UNDERGROUND REPAIR OF WELL SHAFT, AND METHOD USING SUCH DEVICE (VERSIONS) 2008
  • Surdzhaatmadzha Dzhim B.
  • Makdehniel Billi U.
RU2444614C1
FORMATION HYDRAULIC FRACTURING METHOD 2007
  • Uilson Dennis Rehj
RU2453693C2
DOWNHOLE FLUID FLOW CONTROL SYSTEM AND METHOD HAVING DIRECTION DEPENDENT FLOW RESISTANCE 2011
  • Lopes Zhan-Mark
RU2582526C2
METHOD OF INTENSIFICATION OF NATURAL GAS EXTRACTION FROM COAL BEDS 2006
  • Miller Mehtt'Ju
  • Barykin Aleksej Evgen'Evich
  • Braun Ehrni
RU2343275C2
PROCEDURE FOR EXTRACTION OF HEAVY OIL FROM COLLECTOR THROUGH HORIZONTAL BOREHOLE AND SYSTEM OF BOREHOLES 2008
  • Shul'Ts Rodzher L.
  • Khoking Grant
  • Kavender Travis V.
RU2423605C1
SYSTEM AND METHOD FOR WELL PRODUCTION OPTIMISATION 2008
  • Kannan Dkhandajutkhapani
  • Sask Dehvid I.
  • Chzhan' Lan
  • Fajlas Dzhejms Dzh.
RU2520187C2
OIL-FIELD MATERIAL SUPPLY DEVICE AND METHOD 2010
  • Lukharuka Radzhesh
  • Shampajn Rod
  • Pessen Zhan-Lui
  • Khubenshmidt Dzho
  • Lassek Dzhon
RU2569134C2
HOLE-MAKING METHOD AND SYSTEM USING HIGH-POWER LASER 2009
  • Moksli Dzhoel F.
  • Lehnd Mark S.
  • Rinzler Charl'Z K.
  • Fehrklot Brajan O.
  • Koblik Jeshaja
  • Zediker Mark S.
RU2522016C2
HORIZONTAL VERTICAL PUMP SYSTEM FOR EXTRACTING WELL FLUID MEDIUM 2012
  • Lajng Erik
  • Stil Dzheoff
  • Fletcher Den
  • Okhmer Erve
RU2650983C2

RU 2 522 368 C2

Authors

Sjuj Chzhehn Zhun

Pazzi Khorkhe A. Lozada

Odom Kevin

Dates

2014-07-10Published

2010-01-28Filed