FORMATION HYDRAULIC FRACTURING METHOD Russian patent published in 2012 - IPC E21B43/26 

Abstract RU 2453693 C2

FIELD: oil and gas industry.

SUBSTANCE: hydraulic fracturing method of formation saturated with fluid medium involves the following stages: introduction of some quantity of fluid medium of formation hydraulic fracturing to well shaft, which is enough for hydraulic fracturing of formation; introduction of formation treatment substance containing liquid carbon dioxide to well shaft; and evaporation at least of some part of formation treatment substance; at that, stages of introduction of some amount of fluid medium of formation hydraulic fracturing to the well shaft and introduction of formation treatment substance containing liquid carbon dioxide to the well shaft include the following stages as well: pressure control in well shaft and formation so that at least some portion of formation treatment substance remains in liquid state after it is pumped to well shaft; lowering of tubing of some length to well shaft so that annular space is formed between tubing and well shaft; pumping of formation treatment substance via tubing; pumping of fluid medium of formation hydraulic fracturing to annular space; pumping of formation treatment substance to fluid medium of formation hydraulic fracturing in order to create the second fluid medium; collision of the second fluid medium with formation; creation at least of one hydraulic fracturing in formation; forcing-through of the second fluid medium to formation; and pressure discharge in well shaft.

EFFECT: increasing the efficiency of the method.

9 cl, 1 tbl, 3 dwg

Similar patents RU2453693C2

Title Year Author Number
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION 2008
  • Surdzhaatmadzha Dzhim B.
  • Khauehll Mehtt'Ju T.
RU2431036C2
METHOD FOR FORMATION OF PACKINGS IN MULTIPLE PERFORATION CHANNELS IN CASING STRING OF WELL BORE 2006
  • Ist Lojd Eh. Ml.
RU2405920C2
PROCEDURE FOR MAINTAINING PRESSURE IN BOREHOLE OF WELL (VERSIONS) AND DEVICE FOR ITS IMPLEMENTATION 2007
  • Mur Dehril
  • Sherman Skott
  • Broklebehnk Tom
RU2413837C2
METHOD AND SYSTEM FOR PROCESSING OF UNDERGROUND FORMATION WITH USE OF DEVIATION OF PROCESSING FLUID MEDIA (VERSIONS) 2007
  • Klark V. E.
  • Bentli Dug
  • Dehniels Dzhon
  • Fredd Kristofer N.
  • Miller Charl'Z
  • Lassek Dzhon
RU2431037C2
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1
METHOD FOR WELL TREATMENT OF (VERSIONS) 2007
  • Klark V. E.
  • Bentli Dug
  • Deniels Dzhon
  • Fredd Kristofer N.
  • Miller Charlz
  • Lassek Dzhon
RU2587197C2
METHOD OF HYDRAULIC TREATMENT OF COAL BED 2014
  • Shipulin Aleksandr Vladimirovich
  • Korshunov Gennadij Ivanovich
  • Mazanik Evgenij Vasil'Evich
RU2566883C1
METHOD OF MULTISTAGE TREATMENT FOR STIMULATION OF MULTILATERAL WELL 2010
  • Skits Krejg
  • Dzhill Gari E.
  • Makhdi Abbas
RU2553705C2
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2

RU 2 453 693 C2

Authors

Uilson Dennis Rehj

Dates

2012-06-20Published

2007-12-17Filed