FIELD: oil and gas industry.
SUBSTANCE: invention is related to a method of well production optimisation. Intervals are selected in a deviated offshoot and drill-stem testing and borehole treatment is deployed. Then each interval is isolated in order to perform the required testing. The obtained testing data are evaluated in order to define respective recovery measures, which are implemented later by means of the drill-stem testing and borehole treatment.
EFFECT: provision of testing and treatment for the plenty of intervals in a horizontal hole during one running to the borehole.
11 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PERFORMING WELL OPERATIONS USING SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMPS, AND SYSTEM FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2469182C2 |
METHODS, SYSTEMS AND DEVICE FOR TEST ON FLEXIBLE TUBING STRING | 2006 |
|
RU2391502C2 |
METHOD OF MULTISTAGE TREATMENT FOR STIMULATION OF MULTILATERAL WELL | 2010 |
|
RU2553705C2 |
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS | 2007 |
|
RU2395667C1 |
METHOD FOR DEPLOYING INTEGRATED COMPLETION CASE IN ONE RIDE AND COMPLETION SYSTEM | 2019 |
|
RU2799592C2 |
OIL WELL (VARIANTS), OPERATION METHOD THEREFOR AND TRACER ISOTOPE INJECTION SYSTEM USED IN THE WELL | 2001 |
|
RU2263783C2 |
SYSTEM FOR CHEMICAL INJECTION INTO WELL, OIL WELL FOR OIL PRODUCT EXTRACTION (VARIANTS) AND OIL WELL OPERATION METHOD | 2001 |
|
RU2258805C2 |
OIL WELL, METHOD FOR OIL EXTRACTION FROM THE WELL AND METHOD FOR CONTROLLABLE FLUID INJECTION INTO FORMATION THROUGH THE WELL | 2001 |
|
RU2258799C2 |
METHODS AND ASSEMBLY FOR ISOLATION OF ZONES IN WELL BOREHOLE | 2012 |
|
RU2535320C2 |
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) | 2008 |
|
RU2412347C1 |
Authors
Dates
2014-06-20—Published
2008-12-19—Filed