FIELD: mining.
SUBSTANCE: proposed method comprises first layer roadway development at 6 degrees to horizon and stowing with stowing mix. After solidification of top layer stowage massif, lower layer road headings and their stowage are performed. In compliance with this invention, after first top layer roadway development, pipeline is laid in roadway soil via which bottom layer cuts are filled.
EFFECT: higher safety.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STOWING CAVITIES IN ROOF OF MINING ENTRY WAYS AT DEVELOPMENT OF UPPER LAYER WITH LAYING | 2010 |
|
RU2435964C1 |
METHOD TO INCREASE STABILITY OF CEILING IN DOWNWARD SLICING DEVELOPMENT OF DEPOSIT WITH BACKFILLING | 2010 |
|
RU2449124C1 |
METHOD OF MINING THICK STEEP DEPOSITS OF UNSTABLE ORES | 2009 |
|
RU2405108C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
PROCEDURE OF DEVELOPMENT OF THICK STEEP PITCHED ORE BODIES | 2008 |
|
RU2357082C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORES | 2010 |
|
RU2445461C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF STEEPING ORE BODIES IN DESCENTING ORDER WITH CHAMBER SYSTEM | 2022 |
|
RU2790648C1 |
METHOD TO DEVELOP EDGE ORE BODIES WITH UNSTABLE ORES | 2012 |
|
RU2514051C2 |
METHOD OF MINING HEAVY STEEPLY DIPPING DEPOSITS OF UNSTABLE ORE | 2013 |
|
RU2535859C1 |
METHOD TO DEVELOP EDGE ORE BODIES WITH UNSTABLE ORES | 2012 |
|
RU2515285C2 |
Authors
Dates
2014-07-20—Published
2013-02-19—Filed