FIELD: oil and gas industry.
SUBSTANCE: in viscous oil production method in order to form a bottomhole catalytic bed with permeability at least equal to permeability of the bottomhole formation zone water suspension of clayey drilling cuttings is injected preliminary to the bottomhole formation zone, at the suspension contains clay particles which serve as a catalyst for decomposition of hydrogen peroxide and sand particles which ensure permeability of the catalytic bed, or water suspension is used of the mixture of hydrogen peroxide decomposing catalyst, for which purpose a powder of two-, three- or four-valent metal oxide and sand or proppant is used. Then 10-40% solution of hydrogen peroxide, water buffer and solution of non-ionic surface active compound - deemulsifier are injected in sequence to the formation. Then water is supplied from the system to maintain the formation pressure and oil is extracted.
EFFECT: increasing viscous oil extraction efficiency.
2 tbl, 4 ex
Title | Year | Author | Number |
---|---|---|---|
VISCOUS OIL PRODUCTION METHOD | 2013 |
|
RU2534870C2 |
METHOD FOR TREATING BOTTOMHOLE ZONE OF FORMATION WITH HYDROGEN PEROXIDE WITH PHLEGMATIZATION DURING DEVELOPMENT | 2023 |
|
RU2808778C1 |
METHOD FOR WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2270913C2 |
METHOD OF BENCH TREATMENT | 2009 |
|
RU2401381C1 |
METHOD FOR INTENSIFYING OIL PRODUCTION FROM A DENSE AND LOW-PERMEABLE RESERVOIR | 2022 |
|
RU2782666C1 |
METHOD FOR INTENSIFYING OIL PRODUCTION FROM A RESERVOIR | 2022 |
|
RU2780194C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE FORMATION ZONE | 2009 |
|
RU2440490C2 |
METHOD FOR INCREASING THE PRODUCTIVITY OF WELLS | 2021 |
|
RU2768864C1 |
REDUCTION METHOD OF WATER INFLUX TO WELLS | 2014 |
|
RU2576726C1 |
CHEMICAL REAGENT FOR THE TREATMENT OF THE BOTTOM-HOLE ZONE OF THE OIL WELL FORMATION | 2021 |
|
RU2776820C1 |
Authors
Dates
2014-07-20—Published
2012-11-01—Filed