FIELD: electricity.
SUBSTANCE: group of inventions refers to power plant load planning. Method of load planning optimisation for a power plant with one or more generation units. Method involves stage of work state analysis for one or more generation unit components by one or more risk indices associated with one or more generation unit components. Then, according to the method, target function reflecting state of one or more generation unit components is updated, and target function is solved for plan optimisation for one or more generation unit components and work state of one or more generation unit components. In addition, one or more generation unit components are controlled in optimised plan and work state.
EFFECT: optimised load planning at a power plant in order to minimise operational costs.
9 cl, 5 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
TECHNOLOGICAL PROCESS OPTIMISATION METHOD AND SYSTEM FOR THERMAL POWER PLANT | 2010 |
|
RU2533054C2 |
MULTI-LEVEL SYSTEM AND METHOD FOR OPTIMISATION OF RAILWAY TRANSPORT OPERATION | 2004 |
|
RU2359857C2 |
SYSTEM AND METHOD FOR OPTIMISATION OF TRAIN HAUL | 2007 |
|
RU2501695C2 |
OPTIMISED INTEGRATED CONTROL FOR OXY-FUEL COMBUSTION POWER PLANT | 2011 |
|
RU2559416C2 |
SYSTEM AND METHOD FOR OPTIMIZING TRAIN OPERATIONS CONSIDERING RAIL CAR PARAMETERS | 2007 |
|
RU2605648C2 |
SYSTEM AND METHOD FOR OPTIMISATION OF TRAIN OPERATION WITH ALLOWANCE FOR CAR PARAMETERS | 2007 |
|
RU2470814C2 |
SYSTEM AND METHOD FOR OPTIMISATION OF TRAIN CRUISE | 2007 |
|
RU2484994C2 |
SYSTEM AND METHOD FOR OPTIMISATION OF VEHICLE CRUISE | 2007 |
|
RU2481988C2 |
BALANCE CONTROLLER IN THE PUMP STOCK DURING FRACTURING OPERATIONS | 2019 |
|
RU2776144C1 |
CONTROLLING FRACTURING OPERATIONS | 2019 |
|
RU2776140C1 |
Authors
Dates
2014-07-20—Published
2010-05-13—Filed