FIELD: mining.
SUBSTANCE: mortar is mechanically activated at disintegrator. Motor is prepared at sinking platform. Crushed stone and motor are laid in layers in jud over lining.
EFFECT: lining of shafts at high final hardness of concrete.
Title | Year | Author | Number |
---|---|---|---|
METHOD AND APPARATUS FOR ERECTING MONOLITHIC CONCRETE LINING OF MINE SHAFT | 0 |
|
SU1081352A1 |
METHOD OF THE MINE SHAFT WITH A TUBING SUPPORT RECONSTRUCTION | 2017 |
|
RU2655712C1 |
PRECAST SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2478789C1 |
METHOD OF SINKING OF VERTICAL MAIN SHAFTS OF UNSTABLE AND WATERFLOODED ROCKS | 2013 |
|
RU2534274C1 |
METHOD OF ERECTING MONOLITHIC CONCRETE SUPPORT | 0 |
|
SU1723332A1 |
MODULAR SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2474693C1 |
METHOD OF SINKING MINE SHAFT | 0 |
|
SU1606698A1 |
METHOD FOR CONSTRUCTION OF PREFABRICATED-SOLID SUPPORT OF SHAFT OF MINING ENTERPRISE AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631061C1 |
METHOD OF WELL SHAFT CONSTRUCTION, SHAFT SINKING COMBINE, ROCK DESTRUCTION UNIT AND REINFORCING SUPPORT ERECTION DEVICE (VERSIONS) | 2015 |
|
RU2592580C1 |
0 |
|
SU1778310A1 |
Authors
Dates
2014-08-10—Published
2013-04-01—Filed