FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises several steps. At first step, temperature control unit is switched on to inject reservoir water in the model to define reservoir model reservoir model capacity. At second step, temperature control unit is switched off to inject liquid industrial wastes in well model to define reservoir model industrial liquid wastes capacity. Degassing is performed at reservoir model outlet before measurement of reservoir water and industrial wastes flow rates. Compatibility of liquid industrial wastes with reservoir water is established in case reservoir water capacity differs from that of liquid industrial wastes by not over 20%.
EFFECT: higher efficiency.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL FLUSHING PROCESS FROM COLLECTOR RESEARCH METHOD | 2008 |
|
RU2379502C1 |
METHOD FOR UTILIZATION OF INDUSTRIAL EFFECTS OF AN ENTERPRISE IN THE CONDITIONS OF CRYOLITHOZONE | 2022 |
|
RU2790345C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT BY WATER AND GAS INJECTION | 2013 |
|
RU2527432C1 |
METHOD FOR DETERMINING POROSITY AND PERMEABILITY CHARACTERISTICS OF RESERVOIR AND METHOD FOR INCREASING PETROLEUM RECOVERY THEREBY | 2020 |
|
RU2752802C1 |
METHOD FOR DEVELOPING HYDROCARBON DEPOSITS BY CYCLIC GAS INJECTION | 2020 |
|
RU2750458C1 |
METHOD FOR DETERMINING EFFECTIVE GAS-BLOCKING SYSTEMS FOR SELECTIVE BLOCKING OF HIGHLY PERMEABLE GAS-SATURATED ZONES OF UNDER-GAS FIELDS | 2022 |
|
RU2788192C1 |
HIGH-EFFICIENCY PROCESS LIQUID FOR OIL INDUSTRY VTZH RMD-5 | 2010 |
|
RU2429268C1 |
METHOD OF TREATMENT OF THE NEAR-WELLBORE ZONE | 2022 |
|
RU2797160C1 |
METHOD TO KILL WELLS | 1992 |
|
RU2046932C1 |
COMPOSITION FOR INCREASE OF OIL RECOVERY OF FORMATIONS (VERSIONS) | 2014 |
|
RU2546700C1 |
Authors
Dates
2014-08-20—Published
2013-03-12—Filed