FIELD: construction.
SUBSTANCE: method to repair an asphaltic concrete pavement after sampling with a core barrel includes filling of a hole with crushed stone and insertion of a plug into the hole. Besides, a bitumen net is laid onto the bottom of the hole and on top of crushed stone, the plug is inserted, made in the form of a cylinder with a diameter that is 4-8 mm less than the diameter of the core barrel crown, the slot between the plug and the hole is filled with sand, on top the joint is poured with hot bitumen, or edges of the road pavement and the plug are heated with a burner, and a bitumen tab is applied.
EFFECT: increased quality of closing of holes and durability of a repaired section, reduced labour intensiveness and time of repair works.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF THE ASPHALT CONCRETE ROAD PAVEMENT PATCHING AND ROAD MACHINE FOR ITS IMPLEMENTATION | 2017 |
|
RU2664279C2 |
ASPHALT-CONCRETE COATING PATCHING METHOD | 2018 |
|
RU2696735C1 |
METHOD FOR REPAIR OF ROAD SURFACE | 2019 |
|
RU2710585C1 |
BINDING MATERIAL FOR REPAIR OF THE WET ROAD COVERING | 2004 |
|
RU2280014C2 |
METHOD OF PATCHING ROAD PAVEMENT | 2018 |
|
RU2740138C2 |
METHOD FOR PRODUCING COLD ASPHALT-CONCRETE MIXTURE FROM SCREENINGS OF GRANITE GRAVEL CRUSHING | 2016 |
|
RU2625353C1 |
METHOD FOR PRODUCING COLD ASPHALT-CONCRETE MIXTURE BASED ON ASPHALT GRANULATE | 2016 |
|
RU2623748C1 |
REINFORCED ASPHALT CONCRETE COVERING | 2017 |
|
RU2649993C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
ROAD SURFACE REPAIR METHOD | 2023 |
|
RU2820194C1 |
Authors
Dates
2014-08-27—Published
2013-07-29—Filed