FIELD: oil and gas industry.
SUBSTANCE: method includes measurement of yields for the upper and lower formations and formation pressure, as well as degree of water cut in the lower formation. At that each tube of the flow string is equipped preliminary with an acoustic converters and controllers installed at its length mid with its own control code for the purpose of communications with the system telemetric module, and during the period of short-term stop of the centrifugal pump, besides measurement of yields for the upper and lower formations and formation pressure against level and pressure build-up curves, according to results of continuous polling of acoustic converters and controllers boundaries of gas-oil and oil-water levels are determined upon stratification of the three-phase mixture in the tubing string, as well as production volume for each of the three components in the mixture and its water cut.
EFFECT: improved accuracy for determination of yields and water cut for each developed formation of a multipay well.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL WELL OPERATION | 2016 |
|
RU2640597C1 |
METHOD FOR DUAL OPERATION OF WATER-PRODUCING WELL EQUIPPED WITH ELECTRIC CENTRIFUGAL PUMP | 2012 |
|
RU2513796C1 |
OIL WELL DEEP PUMP EQUIPMENT OPERATION METHOD | 2016 |
|
RU2645196C1 |
METHOD OF CONTROLLING FORMATION OF ASPHALTENE SEDIMENTS DURING PRODUCTION OF HIGH POUR POINT ANOMALOUS OIL | 2021 |
|
RU2766996C1 |
METHOD FOR ESTIMATING THE WATER CUT OF WELL OIL | 2017 |
|
RU2674351C1 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
DEVICE FOR DETERMINATION OF WATER CONTENT OF WELL OIL | 2018 |
|
RU2701673C1 |
EVALUATION METHOD OF PRODUCTION WATERING IN OIL-PRODUCING WELL | 2015 |
|
RU2610941C1 |
METHOD FOR SEPARATE EXAMINATION OF TWO FORMATIONS IN THEIR SIMULTANEOUS AND SEPARATE OPERATION BY ONE WELL | 2022 |
|
RU2797149C1 |
METHOD FOR SEPARATE PRODUCTION RATE MEASUREMENT AT DUAL OPERATION OF BOREHOLE COMPLETE WITH ELECTRIC CENTRIFUGAL PUMP | 2014 |
|
RU2567249C1 |
Authors
Dates
2014-11-20—Published
2013-07-24—Filed