FIELD: construction.
SUBSTANCE: method includes deepening and installation of an underwater part of the structure into bottom deposits, fixed fastening of a hollow board to it, made in the form of a ball segment with perforated surface. During assembly of the board its upper part is placed above the surface of the ice cover, and the base is submerged into water. Supply-and-exhaust shafts and tight hatches are placed into the cavity of the board. The underwater part of the platform is equipped with transition gateways and joint assemblies. A tunnel is installed from the platform to the coast, and in it they install a pipe canal, tight partitions, additionally it is equipped with transition gateways, joint assemblies. The tunnel is used as a permanent transport link and moorage for underwater vessels.
EFFECT: increased reliability of operation of hydraulic engineering structures of island type in Arctic seas.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
OFFSHORE ICE-RESISTANT PROCESS PLATFORM | 2015 |
|
RU2603340C1 |
METHOD TO INSTALL PIPE CANAL UNDER NORTHERN CONDITIONS | 2013 |
|
RU2539043C1 |
DEVELOPMENT OF MARINE DEEP SEA OIL-AND-GAS DEPOSITS | 2013 |
|
RU2547161C2 |
METHOD TO ERECT DIKE DAM ON ARCTIC SEA SHORE | 2011 |
|
RU2453653C1 |
PIER | 2013 |
|
RU2535726C1 |
METHOD TO ERECT ICE MOORAGE IN ARCTIC SEAS | 2012 |
|
RU2493324C1 |
SYSTEM OF PROTECTING WELL FROM EFFECT OF ICE MASSIF | 2007 |
|
RU2344226C1 |
SYSTEM FOR SUBSEA OIL OR GAS FIELD DEVELOPMENT | 2013 |
|
RU2536525C1 |
METHOD TO DESTROY ICE COVER | 2010 |
|
RU2452812C1 |
PROCEDURE FOR CONSTRUCTION OF DEEP WATER SEA OIL AND GAS DEPOSITS | 2008 |
|
RU2383683C1 |
Authors
Dates
2014-11-27—Published
2013-08-13—Filed