DIAMOND MINING PLANT Russian patent published in 2014 - IPC E21F17/00 E21C41/22 

Abstract RU 2534294 C2

FIELD: mining.

SUBSTANCE: diamond mining plant comprises a separating factory, plants for metal smelting from minerals associated with diamonds, and a power unit with electric energy battery. At that at the plant the diamond mining harvester is used with the drilling device and the chamber of enrichment of diamonds, providing the ability to search a kimberlite pipe within the diamond field. The wells remaining after drilling are used as elements of a heat pump in heated objects. Metals melted in plants are used at the production site for the construction of buildings and power lines. The bases of the heated objects, including smelting plants over the blown-off underground are equipped with pylon foundations with reactors around the perimeter of the building, filled with water and oil. Under heavy equipment inside the building the pylons with reactors are placed, mounted annularly, combined with oil and water tori. The reactors from the side of heated part of the building are covered with insulation, and inside contain the heater and made with the ability to fill with water of their lower part and oil in the upper part of the reactor. When water freezes and high pressure is created in the reactor the oil is capable to enter to the upper oil torus with low pressure where from it can be pumped by the pump to the lower oil torus with the constant high pressure where from the oil is capable to enter along the pipe to the water jet to generate electricity. The opportunity of defrosting water in reactors is provided, alternately along the ring within the pylon, ensuring its stability. Under the pylon the under-pylon pad is located, that rests on the foundation cup, standing on a compacted layer of gravel. The over-pylon pad rests on the pylon, in which the rack is inserted, and the plates of lower floor rest on the under-pylon pad, under which a cold ventilated space is generated. On the over-pylon pad the upper floor rests, on which the equipment is installed, and including the melting furnace. The perimeter foundations are similarly equipped, which are made of reactors placed abutting to each other along the contours of the building.

EFFECT: increased productivity of diamond mining and related minerals, while ensuring ecological safety for the environment.

12 dwg

Similar patents RU2534294C2

Title Year Author Number
DIAMOND PRODUCTION COMBINE 2009
  • Sarkisov Sergej Karpovich
  • Sarkisov Avedik Sergeevich
RU2426879C2
BUILDING 2011
  • Sarkisov Sergej Karpovich
  • Sarkisov Avedik Sergeevich
  • Krymina Anna Vladimirovna
RU2475612C2
DRIFTING STATION 2004
  • Sarkisov S.K.
  • Sarkisov A.S.
  • Rodionov I.V.
RU2265547C1
METHOD OF DEVELOPMENT OF LOW-COMMODITY KIMBERLITE PIPES 2014
  • Androsov Artur Dmitrievich
  • Zarovjanev Boris Nikolaevich
  • Androsov Artur Arturovich
  • Gaenkova Irina Vladimirovna
RU2568654C1
BUILDING 2005
  • Sarkisov Sergej Karpovich
  • Bronskaja Irina Ivanovna
RU2312956C2
SPACECRAFT 2004
  • Sarkisov Sergej Karpovich
  • Volkov Pavel Andreevich
  • Kondrashev Aleksandr Nikolaevich
  • Markelov Il'Ja Evgen'Evich
RU2271965C2
METHOD OF LUMPING METALLURGICAL RAW MATERIAL 1992
  • Vegman E.F.
  • Jusfin Ju.S.
  • Zhak A.R.
  • Pyrikov A.N.
  • Degtjarenko I.A.
  • Nevraev V.P.
  • Tleubagulov B.S.
  • Bakumova N.V.
  • Lelechenko T.O.
RU2016100C1
DEVELOPMENT METHOD OF KIMBERLITE DEPOSITS 2008
  • Khon Vjacheslav Ivanovich
RU2384706C1
DEVELOPMENT METHOD OF DIAMOND-BEARING KIMBERLITE PIPES 2011
  • Burakov Aleksandr Mikhajlovich
  • Ermakov Sergej Aleksandrovich
  • Panishev Sergej Viktorovich
  • Fedorov Lazar' Nikolaevich
RU2465460C2
IMPACTITE MINER 2013
  • Sarkisov Sergej Karpovich
  • Sarkisov Avedik Sergeevich
RU2554617C2

RU 2 534 294 C2

Authors

Sarkisov Sergej Karpovich

Sarkisov Avedik Sergeevich

Dates

2014-11-27Published

2013-03-06Filed