FIELD: mining.
SUBSTANCE: method involves installation of a sinking tower, driving of a shaft at least with one mine mini excavator with a replaceable hydraulic hammer. Tubing lining of the shaft is performed using a unit moving in the shaft. Installation of tubing is performed using a tubing hydraulic claw with a counter-weight, which is arranged on an overhead crane moved with manually driven crabs.
EFFECT: acceleration of driving of a process branch from construction of a mouth to construction of a support of the process branch.
5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CONSTRUCT VERTICAL MINE BY BLASTING AND DRILLING METHOD WITH TUBING LINING AND TUNNELLING COMPLEX FOR METHOD REALISATION | 2012 |
|
RU2493367C1 |
METHOD TO LAY CONCRETE BEHIND TUBBING LINING OF VERTICAL MINE AND COMPLEX OF EQUIPMENT FOR REALISATION OF METHOD | 2012 |
|
RU2514338C1 |
METHOD OF WELL SHAFT CONSTRUCTION, SHAFT SINKING COMBINE, ROCK DESTRUCTION UNIT AND REINFORCING SUPPORT ERECTION DEVICE (VERSIONS) | 2015 |
|
RU2592580C1 |
DEVICE FOR CONSTRUCTION OF MINE SHAFTS | 1997 |
|
RU2141030C1 |
METHOD FOR ERECTION OF STEEL CONSTRUCTIONS OF VERTICAL MINE OPENING SHAFT AND ARMORING UNIT FOR IMPLEMENTATION OF THE METHOD | 2014 |
|
RU2601647C2 |
SHAFT SINKING COMBINE | 2015 |
|
RU2600807C1 |
METHOD FOR CONSTRUCTION OF PREFABRICATED-SOLID SUPPORT OF SHAFT OF MINING ENTERPRISE AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631061C1 |
METHOD TO TUNNEL HORIZONTAL OR INCLINED UNDERGROUND MINE AND TUNNELLING MACHINE FOR METHOD REALISATION | 2011 |
|
RU2490467C2 |
APPARATUS FOR MAKING MINE SHAFTS | 0 |
|
SU1752964A1 |
HEADING SET FOR AUXILIARY WORKINGS | 2015 |
|
RU2599115C1 |
Authors
Dates
2015-01-20—Published
2013-11-19—Filed