FIELD: mining.
SUBSTANCE: invention relates to mining and is intended for installation of steel constructions of a vertical mine opening shaft. Armoring unit for erection of steel constructions of a vertical mine opening shaft comprises an upper armoring running bridge with a suspension at monkey engines under a polyspast scheme and lower armoring running bridge with a suspension at on thimbles. Upper running bridge and lower running bridge are equipped with lifting devices and can move relative to each other.
EFFECT: technical result of the declared invention is high rate of erection of steel constructions of a vertical mine opening shaft due to reduced weight and simultaneous installation of tiers of steel constructions and conductors.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
ERECTION METHOD OF LINER OF INCLINED OR HORIZONTAL SHAFT, AND SECTIONAL STEEL FORMWORK FOR METHOD'S IMPLEMENTATION | 2012 |
|
RU2510459C1 |
MACHINERY SET FOR SINKING VERTICAL MINE WORKINGS | 0 |
|
SU750078A1 |
SINKING PLATFORM FOR PASSING ROCK WORKINGS | 0 |
|
SU1102963A1 |
METHOD TO CONSTRUCT VERTICAL MINE BY BLASTING AND DRILLING METHOD WITH TUBING LINING AND TUNNELLING COMPLEX FOR METHOD REALISATION | 2012 |
|
RU2493367C1 |
METHOD OF WELL SHAFT CONSTRUCTION, SHAFT SINKING COMBINE, ROCK DESTRUCTION UNIT AND REINFORCING SUPPORT ERECTION DEVICE (VERSIONS) | 2015 |
|
RU2592580C1 |
CONSTRUCTION METHOD OF PROCESS BRANCH OF VERTICAL WELL SHAFT AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2539454C1 |
ROCK LOADER FOR SINKING VERTICAL WORKINGS | 0 |
|
SU1160037A1 |
ENTRY-DRIVING UNIT FOR SINKING VERTICAL MINE WORKINGS | 0 |
|
SU1121440A1 |
APPARATUS FOR MAKING MINE SHAFTS | 0 |
|
SU1752964A1 |
SHAFT SINKING COMBINE | 2015 |
|
RU2600807C1 |
Authors
Dates
2016-11-10—Published
2014-06-04—Filed