FIELD: mining.
SUBSTANCE: invention relates to the field of mining and may be used in construction of various vertical underground mines. The proposed method for laying concrete behind tubbing lining of the vertical mine includes a sequence of operations performed by means of equipment installed on a vertically moved sinking platform. During the method the following is performed: reception of a concrete mix into at least one hopper; installation of at least one channel of concrete mix feed behind the tubbing lining by means of a hydraulic drive; injection of a concrete mix with required movement of the position of the specified channel by means of the hydraulic drive. The complex of equipment for laying concrete behind the tubbing lining of the vertical mine is also installed onto the vertically moved sinking platform. At the same time the sinking platform is provided for works related to assembly of the tubbing lining. The proposed method of equipment includes: at least one hopper to receive a concrete mix with a concrete pump; at least one channel of concrete mix feed behind the tubbing lining; at least one hydraulic manipulator to control position of the specified channel.
EFFECT: expansion of arsenal of technical facilities used in tunnelling of vertical mines and increased quality of erection of a vertical mine and accuracy of laying of a concrete mix behind tubbing lining.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CONSTRUCT VERTICAL MINE BY BLASTING AND DRILLING METHOD WITH TUBING LINING AND TUNNELLING COMPLEX FOR METHOD REALISATION | 2012 |
|
RU2493367C1 |
CONSTRUCTION METHOD OF PROCESS BRANCH OF VERTICAL WELL SHAFT AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2539454C1 |
METHOD TO TUNNEL HORIZONTAL OR INCLINED UNDERGROUND MINE AND TUNNELLING MACHINE FOR METHOD REALISATION | 2011 |
|
RU2490467C2 |
ERECTION METHOD OF LINER OF INCLINED OR HORIZONTAL SHAFT, AND SECTIONAL STEEL FORMWORK FOR METHOD'S IMPLEMENTATION | 2012 |
|
RU2510459C1 |
METHOD FOR ERECTION OF STEEL CONSTRUCTIONS OF VERTICAL MINE OPENING SHAFT AND ARMORING UNIT FOR IMPLEMENTATION OF THE METHOD | 2014 |
|
RU2601647C2 |
DEVICE FOR CONSTRUCTION OF MINE SHAFTS | 1997 |
|
RU2141030C1 |
METHOD FOR CONSTRUCTION OF TUNNEL INTERNAL STRUCTURES, COMPLEX FOR CONSTRUCTION OF TUNNEL INTERNAL STRUCTURES AND MOVABLE SCAFFOLDS | 2022 |
|
RU2801520C1 |
ENTRY-DRIVING UNIT FOR SINKING VERTICAL MINE WORKINGS | 0 |
|
SU1121440A1 |
METHOD OF WELL SHAFT CONSTRUCTION, SHAFT SINKING COMBINE, ROCK DESTRUCTION UNIT AND REINFORCING SUPPORT ERECTION DEVICE (VERSIONS) | 2015 |
|
RU2592580C1 |
APPARATUS FOR MAKING MINE SHAFTS | 0 |
|
SU1752964A1 |
Authors
Dates
2014-04-27—Published
2012-09-13—Filed