FIELD: machine building.
SUBSTANCE: method comprises the installation of a detail in supports and drilling in it of a hole using the balance-beams. The used balance-beams are fastened on elastic suspensions and mounted on the detail at a half distance between each neighbouring pair of supports. A rigidity of the elastic suspension and mass of each used balance-beam are calculated from the condition of equality of rotation speed of the detail, determined depending on the pre-set modes of processing, and natural frequency of the balance-beam. Drilling is performed continuously for all over the depth of the processed hole of the detail.
EFFECT: deviation of the drill axis from the hole axis is decreased due to continuous compensation of non-uniform hardness of the detail during drilling, the quality of drilling of deep holes is improved.
2 tbl, 2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DRILLING DEEP HOLES | 2010 |
|
RU2421302C1 |
0 |
|
SU540702A1 | |
BORING OR REBORING DEVICE | 2009 |
|
RU2424877C2 |
DRILLING HEAD | 1991 |
|
RU2090315C1 |
DEVICE FOR HOLE DRILLING OR BORING | 2014 |
|
RU2567933C1 |
METHOD OF DRILLING DEEP HOLES | 0 |
|
SU569085A1 |
METHOD OF DRILLING DEEP OPENINGS OF SMALL DIAMETER, AND BLADED DRILL OF ONE-WAY CUTTING | 2000 |
|
RU2176176C2 |
METHOD FOR DEEP BORING PRECISION CYLINDERS | 1992 |
|
RU2008126C1 |
METHOD OF WORKING DEEP HOLES | 0 |
|
SU1400794A1 |
METHOD OF FINISHING DEEP BORES | 2016 |
|
RU2658769C2 |
Authors
Dates
2015-01-20—Published
2013-05-15—Filed