FIELD: oil and gas industry.
SUBSTANCE: method comprises test forcing of fracturing fluid and pile of fracturing fluid with proppant, correcting the fracturing project and performing of the main fracturing process. In highly permeable reservoirs with absolute permeability not less than 100 mD the main fracturing process is carried out with usage of proppant fractions, which include initial fraction with mesh size from 30/40 up to 20/40 and the main coarse fraction with mesh size of 12/18 and more in the volume not less than 70% of the total proppant quantity with final proppant concentration not less than 750 kg/m3. While injecting fraction with mesh size of 12/18 and more through perforated openings fluid consumption is set so that it does not exceed 3 m3/min and wellhead pressure is maintained at the level less than 35 MPa.
EFFECT: improving the efficiency of hydraulic fracturing for highly permeable strata.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
WELL OPERATION STIMULATION | 2014 |
|
RU2541974C1 |
METHOD OF INTENSIFICATION OF OPERATION OF WELL | 2014 |
|
RU2551589C1 |
WELL OPERATION STIMULATION | 2013 |
|
RU2531716C1 |
METHOD FOR WELL INTENSIFICATION, EXPOSING LOW-PERMEABLE FORMATION | 2016 |
|
RU2603986C1 |
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2705643C1 |
METHOD TO INTENSIFY WELL OPERATION | 2014 |
|
RU2551586C1 |
METHOD FOR IMPROVED WORK WELL | 2015 |
|
RU2582150C1 |
WELL OPERATION STIMULATION | 2014 |
|
RU2541983C1 |
METHOD TO INTENSIFY OPERATION OF WELL THAT EXPOSED MULTIPAY DEPOSIT | 2013 |
|
RU2524079C1 |
WELL OPERATION STIMULATION | 2013 |
|
RU2536524C1 |
Authors
Dates
2015-02-10—Published
2014-03-03—Filed