FIELD: mining.
SUBSTANCE: method comprises a test injection of fracturing fluid and a pack of fracturing fluid with proppant, correction of the fracturing project and carrying out the main fracturing process. At that in the high-permeability reservoirs having an absolute permeability of not less than 100 mD, the main process of hydraulic fracturing is carried out using standard working fluid flow rate of 2.2 m3/min to 4.0 m3/min. When pressing the proppant-gel mixture the stepwise reduction of flow rate is carried out with the reduction step in the range of 0.1 m3/min to 0.5 m3/min, but to the value of not less than 2.0 m3/min. The final concentration of proppant is set of not less than 800 kg/m3.
EFFECT: increase in efficiency of intensification of operation of the well by creating a wider and conducting crack in the bottom-hole area of the layer.
1 tbl
| Title | Year | Author | Number | 
|---|---|---|---|
| WELL OPERATION STIMULATION | 2014 | 
 | RU2540712C1 | 
| WELL OPERATION STIMULATION | 2014 | 
 | RU2541974C1 | 
| METHOD TO INTENSIFY WELL OPERATION | 2014 | 
 | RU2551586C1 | 
| PRODUCTIVE FORMATION HYDRAULIC FRACTURING METHOD | 2011 | 
 | RU2453695C1 | 
| FORMATION HYDRAULIC FRACTURING METHOD | 2011 | 
 | RU2453694C1 | 
| WELL OPERATION STIMULATION | 2013 | 
 | RU2536524C1 | 
| WELL OPERATION STIMULATION | 2014 | 
 | RU2541983C1 | 
| WELL OPERATION STIMULATION | 2013 | 
 | RU2531716C1 | 
| METHOD FOR IMPROVED WORK WELL | 2015 | 
 | RU2582150C1 | 
| METHOD TO INTENSIFY OPERATION OF WELL THAT EXPOSED MULTIPAY DEPOSIT | 2013 | 
 | RU2524079C1 | 
Authors
Dates
2015-05-27—Published
2014-09-09—Filed