FIELD: oil and gas industry.
SUBSTANCE: method includes bottom hole back filling, test pumping of a breakdown agent and a pack of the breakdown agent with a proppant, correction of the breakdown project and completion of the primary breakdown process. For backfilling of the bottom hole they use proppant waste of hydraulic rupture completion. The waste is delivered to the bottom hole in portions by means of a sludge pump.
EFFECT: reduction of material consumption for hydraulic rupture.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL OPERATION STIMULATION | 2014 |
|
RU2541983C1 |
PRODUCTIVE FORMATION HYDRAULIC FRACTURING METHOD | 2011 |
|
RU2453695C1 |
METHOD OF INTENSIFICATION OF OPERATION OF WELL | 2014 |
|
RU2551589C1 |
FORMATION HYDRAULIC FRACTURING METHOD | 2011 |
|
RU2453694C1 |
WELL OPERATION STIMULATION | 2014 |
|
RU2541974C1 |
METHOD FOR IMPROVED WORK WELL | 2015 |
|
RU2582150C1 |
WELL OPERATION STIMULATION | 2013 |
|
RU2536524C1 |
WELL OPERATION STIMULATION | 2014 |
|
RU2540712C1 |
WELL OPERATION STIMULATION | 2013 |
|
RU2531716C1 |
METHOD TO INTENSIFY OPERATION OF WELL THAT EXPOSED MULTIPAY DEPOSIT | 2013 |
|
RU2524079C1 |
Authors
Dates
2015-05-27—Published
2014-09-09—Filed