FIELD: oil and gas industry.
SUBSTANCE: completion method for a well with a horizontal shaft includes drilling of the well, running in of a production string to a horizontal part of the well with a mud-inflatable packer, a stop ring and a stage cementing collar at the end, injection of cement grout to the annular space, the process withhold for the time of the cement hardening, drilling of the stop ring and collar and the well development. At that at running in the production string is stopped at a distance from the bottomhole, and drilling of the stop ring and collar is made with the usage of a drilling fluid with a density from 1.20 up to 1.25 g/cm3, the drilling fluid is injected with a rate of 18-21 l/s at a wellhead pressure of 8-10 MPa. Besides, the interval from the production string end till the bottomhole is worked out by a bit, the well is washed by the drilling fluid with a density of 1.20-1.25 g/cm3, at that the drilling fluid is injected with a rate of 18-21 l/s at a wellhead pressure of 8-10 MPa.
EFFECT: higher well productivity.
2 cl
Title | Year | Author | Number |
---|---|---|---|
COMPLETION METHOD OF HORIZONTAL WELL | 2014 |
|
RU2541979C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541980C1 |
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER | 2012 |
|
RU2490426C1 |
CONSTRUCTION OF OIL PRODUCTION WELL | 2013 |
|
RU2524089C1 |
METHOD TO CONSTRUCT WELL OF SMALL DIAMETER IN COMPLEX ROCKS | 2012 |
|
RU2490415C1 |
CONSTRUCTION METHOD FOR SLIM-HOLE WELL | 2012 |
|
RU2490429C1 |
WELL STAGE CEMENTING METHOD | 2014 |
|
RU2547863C1 |
WELL CONSTRUCTION METHOD | 2014 |
|
RU2541978C1 |
METHOD OF ISOLATION OF THIEF ZONE DURING WELL DRILLING | 2014 |
|
RU2562306C1 |
WELL CONSTRUCTION METHOD | 2008 |
|
RU2375551C1 |
Authors
Dates
2015-02-20—Published
2014-05-21—Filed