COMPLETION METHOD OF HORIZONTAL WELL Russian patent published in 2015 - IPC E21B21/00 

Abstract RU 2541979 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes drilling of a well, running in of a production string to a horizontal part of the well with a mud-inflatable packer, a stop ring and a stage cementing collar at the end, injection of the cement grout to the annular space, the process withhold for the time of the cement hardening, drilling of the stop ring and collar and the well development. At running in the production string is stopped at a distance from the bottomhole, drilling of the stop ring and collar is made with the usage of a drilling fluid with a density from 1.20 up to 1.25 g/cm3, it is injected with a rate of 18-21 l/s at a pressure of 8-10 MPa at the wellhead. The interval from the production string end till the bottomhole is worked out by a bit, the well is washed by the drilling fluid at a wellhead pressure of 8-10 MPa, a filtering string of a low diameter is run in through the production string and an interval from the bottomhole until the production string is covered with partial covering of the production string end; the filtering string remains in the interval of the productive formation. At running in the production string is stopped at a distance from the bottomhole equal to 50-150 m. Partial covering of the production string end by the filtering string is made per 5-10 m.

EFFECT: increased well productivity.

3 cl

Similar patents RU2541979C1

Title Year Author Number
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT 2014
  • Ibragimov Nail' Gadbulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Asljamov Ajdar Ingelevich
RU2541981C1
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT 2014
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Osipov Roman Mikhajlovich
RU2541980C1
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER 2012
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Osipov Roman Mikhajlovich
  • Sinchugov Nikolaj Sergeevich
  • Garaev Rafaehl' Rasimovich
RU2490426C1
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT 2022
  • Leontev Dmitrij Sergeevich
  • Vaganov Yurij Vladimirovich
  • Ovchinnikov Vasilij Pavlovich
RU2793351C1
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING 2021
  • Shamsutdinov Nikolaj Maratovich
  • Milkov Aleksandr Yurevich
  • Elshin Aleksandr Sergeevich
  • Leontev Dmitrij Sergeevich
RU2775628C1
METHOD FOR CONSTRUCTING SIDETRACK WITH HORIZONTAL ENDING 2014
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
  • Garaev Rafaehl' Rasimovich
  • Sinchugov Nikolaj Sergeevich
RU2553732C1
METHOD OF GAS WELL COMPLETION 2013
  • Likhushin Aleksandr Mikhajlovich
  • Jankevich Vasilij Fedorovich
  • Ruban Georgij Nikolaevich
  • Mkrtychan Jakov Sergeevich
RU2534548C1
METHOD OF HORIZONTAL OIL WELL CONSTRUCTION 2013
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
  • Garaev Rafaehl' Rasimovich
  • Krotkov Igor' Ivanovich
RU2520033C1
CONSTRUCTION OF OIL PRODUCTION WELL 2013
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Asljamov Ajrat Ingelevich
  • Osipov Roman Mikhajlovich
  • Garaev Rafaehl' Rasimovich
  • Sinchugov Igor' Nikolaevich
RU2524089C1
WELL COMPLETION METHOD 2023
  • Zaripov Ildar Mukhamatullovich
  • Iskhakov Albert Ravilevich
RU2795281C1

RU 2 541 979 C1

Authors

Ibragimov Nail' Gabdulbarievich

Rakhmanov Ajrat Rafkatovich

Asljamov Ajrat Ingelevich

Garaev Rafaehl' Rasimovich

Sinchugov Nikolaj Sergeevich

Dates

2015-02-20Published

2014-05-21Filed