FIELD: electricity.
SUBSTANCE: in case of emergency in the network pulse-time coded commands for switching off are set for non-essential consumers, the station operating in emergency mode to the isolated network section is selected, in switchgear with voltage 10(6)-20 kV at the transmitting end of the line passing from the selected station in case of emergency power circuit breakers are switched off for a short moment and switched on and power supply interruptions of different fixed duration are created at actuators related to this line of power consumers, in switchgear of a lower voltage level these interruptions are received as pulse-time coded commands and upon their identification power switches of non-essential consumers are switched off on a selective basis.
EFFECT: improved reliability of power supply for essential consumers.
2 dwg
             
         
            
              
                | Title | Year | Author | Number | 
							
              
                | AUTOMATIC FREQUENCY LOAD SHEDDING IN THE POWER SUPPLY POWER DISTRIBUTION NETWORK CONTROL METHOD | 2017 | 
										Artsishevskij Yan LeonardovichGieev Borbad Mirzoevich | RU2665033C1 | 
							
              
                | METHOD OF ANTI-ACCIDENT CONTROL OF MODE OF PARALLEL OPERATION OF SYNCHRONOUS GENERATORS AND DIVISION AUTOMATION IN ELECTRIC NETWORKS | 2018 | 
										Ilyushin Pavel VladimirovichKulikov Aleksandr Leonidovich | RU2692054C1 | 
							
              
                | GUARANTEED POWER SUPPLY DEVICE | 2012 | 
										Abramovich Boris NikolaevichSychev Jurij Anatol'EvichUstinov Denis Anatol'Evich | RU2481688C1 | 
							
              
                | METHOD FOR POWER SUPPLY TO STRUCTURE OR COMPLEX THEREOF BEING ERECTED OR RECONSTRUCTED; METHOD FOR POWER SUPPLY TO SETTLEMENT, LOCATION, DISTRICT OF TOWN, INDUSTRIAL OR AGROINDUSTRIAL COMPLEX, OR CITY; POWER NETWORK OF ERECTED OR RECONSTRUCTED STRUCTURE OR COMPLEX OF STRUCTURES; POWER SUPPLY TO SETTLEMENT, LOCATION, DISTRICT OF TOWN, INDUSTRIAL OR AGROINDUSTRIAL COMPLEX, OR CITY | 2003 |  | RU2240638C1 | 
							
              
                | DEVICE FOR UNINTERRUPTED POWER SUPPLY | 2015 | 
										Abramovich Boris NikolaevichSychev Jurij AnatolevichBelskij Aleksej AnatolevichFedorov Aleksej Vjacheslavovich | RU2576664C1 | 
							
              
                | DEVICE FOR GUARANTEED POWER SUPPLY TO ESSENTIAL LOADS | 2009 | 
										Belenko Anton VladimirovichPoljakov Vitalij Evgen'EvichMuratbakeev Ehduard Khamitovich | RU2410816C2 | 
							
              
                | MAINTENANCE METHOD FOR POWER NETWORK OF DISTRICT, TOWN, OR CITY; MAINTENANCE METHOD FOR POWER NETWORK DURING ERECTION OF DEVELOPMENT PROJECTS THEREOF; MAINTENANCE METHOD FOR POWER NETWORK DURING REPAIRS AND/OR RECONSTRUCTION OF BUILDING, STRUCTURE, COMPLEX OF BUILDINGS, INDUSTRIAL COMPLEX PROJECTS; AND METHOD FOR POWER NETWORK MAINTENANCE DURING RECONSTRUCTION AND/OR ERECTION OF TRANSPORT COMPLEX PROJECTS IN DISTRICT, TOWN, OR CITY | 2003 |  | RU2240639C1 | 
							
              
                | DEVICE FOR PROTECTION OF MINIMAL VOLTAGE OF A GROUP OF ELECTRIC MOTORS | 0 | 
										Burykin Vladimir VasilevichPavlov Gennadij MikhajlovichSavelev Vitalij Andreevich | SU1640774A1 | 
							
              
                | ELECTRIC ENERGY STORAGE CONTROL SYSTEM FOR EXPANSION OF RANGE OF PERMISSIBLE MODES OF GENERATING INSTALLATIONS OF DISTRIBUTED GENERATION SOURCES AT SHORT-TERM FREQUENCY DEVIATIONS | 2019 | 
										Iliushin Pavel VladimirovichKulikov Aleksandr LeonidovichLoskutov Anton Alekseevich | RU2718113C1 | 
							
              
                | POWER SUPPLY LOSS PROTECTION DEVICE | 2011 | 
										Shabanov Vitalij AlekseevichKabargina Ol'Ga VladimirovnaLeont'Eva Natal'Ja Anatol'Evna | RU2460198C1 |