FIELD: mining.
SUBSTANCE: method comprises well drilling, cracking by injection into the well of crack-forming material, plugging of hole mouth. Meanwhile the well cross-section is transformed from cylindrical into square, and then layer by layer the well is filled with quicklime with compaction and sealing of each layer. Into the formed cracks in a radial direction from angles of square cross-section well and by means of injector the strengthening solution is injected. The method allows to obtain stable cracks in a radial direction from angles of well square, that results in increase of strengthening volume. Due to wedging action of lime slaking and the stress concentrations the cleavage cracks are formed, the length of which amounts 2-3 lengths of the side of square well, and the width 5-15 mm. At the expense of increase of parameters of cracks in a radial direction from angles of square section well with the subsequent injection of strengthening solution the physico-mechanical properties of the ground are improved, as far as the infilling of all formed cracks results in ground strengthening, that improves bearing capacity of clay saturated soils. Besides the given method allows to work with small-sized and minimum quantity of machinery in any conditions of building.
EFFECT: increase of bearing capacity of clay water-saturated soils.
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PRODUCE CRACKS IN WATERLOGGED CLAYEY SOILS | 2013 |
|
RU2545573C1 |
METHOD FOR REINFORCEMENT OF SATURATED SOILS | 2008 |
|
RU2392382C2 |
METHOD TO CREATE SPATIAL STRUCTURES FROM HARDENING MATERIAL IN SOIL MASSIF | 2010 |
|
RU2459037C2 |
FOUNDATION PREPARATION METHOD | 2008 |
|
RU2380482C1 |
METHOD FOR COMPACTION OF LOESSIAL SOILS IN BASES OF BUILDINGS AND STRUCTURES | 1991 |
|
RU2015247C1 |
SOIL CONSOLIDATION METHOD AND DEVICE | 2003 |
|
RU2260092C1 |
METHOD FOR FORMATION OF GROUTING CURTAIN IN LOESSIAL SOIL | 1991 |
|
RU2015248C1 |
METHOD FOR IMPROVING MASSIVE OF LOESSIAL COLLAPSIBLE SOIL IN BASE OF BUILDINGS AND STRUCTURES | 2006 |
|
RU2331736C1 |
PROCESS OF PREPARATION OF FOUNDATIONS | 1995 |
|
RU2122068C1 |
METHOD FOR SOIL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2588511C2 |
Authors
Dates
2015-04-10—Published
2013-10-11—Filed