FIELD: oil and gas industry.
SUBSTANCE: system includes a group pumping station with a pump feeding water line with a pressure sensor, a water discharge line of the pump, a valve manifold, a system of distributing water lines downstream the pump with flow meters, shut-off and control valves, low-permeable injectors with return valves and high-permeable injectors. At that the system operates in a cyclic mode with cycles of pressure increase and decrease in the feeding water line. The high-permeable injectors are equipped with spring-operated flow controllers. At the water line feeding the pump there is a pressure controller bound with a bypass line with a flow controller and automatic gate. This gate is coupled functionally with a cluster controller. It ensures the collection of data from the flow meters and pressure sensor with the analysis of the performed task against pressure injected through the distributing water lines. The automatic gate is made so that at the r signal of the controller it provides the water flow through the bypass line in order to compensate water injection to the low-permeable injectors at the total deficiency in the injection volume to them.
EFFECT: excluding deficiency in the injection volume to the low-permeable injectors and pressure balancing in feeding water lines.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
RESERVOIR PRESSURE MAINTENANCE SYSTEM | 2019 |
|
RU2714898C1 |
SYSTEM OF CLUSTER WATER INJECTION TO RESERVOIR | 2014 |
|
RU2545204C1 |
RESERVOIR PRESSURE MAINTENANCE SYSTEM | 2012 |
|
RU2520119C1 |
METHOD FOR CLEANING FACE-ADJACENT ZONE OF BED OF FORCE WELL WITH WASHING OF TRANSFER WATER DUCT | 2005 |
|
RU2293175C1 |
METHOD OF SIMULTANEOUS AND SEPARATE OPERATION OF INJECTION WELL | 2012 |
|
RU2488687C1 |
CLEANING METHOD FOR BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2006 |
|
RU2306405C1 |
METHOD FOR CLEANING NEAR WELLBORE REGION OF INJECTION WELLS | 2007 |
|
RU2332557C1 |
METHOD FOR MAINTAINING FORMATION PRESSURE AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2503804C1 |
PROCESS OF CLEARING OF FACE ZONE OF INJECTION WELLS | 2000 |
|
RU2165012C1 |
SYSTEM FOR FORMATION PRESSURE KEEPING | 2004 |
|
RU2269647C1 |
Authors
Dates
2015-04-10—Published
2014-04-15—Filed