FIELD: mining.
SUBSTANCE: in the test bench for study of effect of explosion products on a step of explosive wells which comprises a high pressure chamber closed from above by a cover with a membrane connected to the explosive well simulator designed as a pipe according to the invention, the lower part of the explosive well simulator is also fitted with the starting section with the spring starting arrangement for forced destruction of the membrane at the time of achievement of the pre-set pressure in the high pressure chamber.
EFFECT: providing of pre-set air pressure on the stem in the explosive well simulator by forced destruction of the membrane.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
TEST RIG TO STUDY EFFECT OF EXPLOSION PRODUCTS WITH LAUNCHING DEVICE | 2014 |
|
RU2553023C1 |
STAND FOR STUDY OF IMPACT OF EXPLOSION PRODUCTS WITH ELECTROMAGNETIC TRIGGERING DEVICE | 2014 |
|
RU2559795C1 |
BENCH FOR ANALYSIS OF EXPLOSION PRODUCTS EFFECTS THAT INCORPORATES PERCUSSION STARTER | 2014 |
|
RU2566908C1 |
BENCH TO STUDY LOCKING CAPABILITY OF BLASTHOLE TAMPING | 2012 |
|
RU2485599C1 |
BENCH TO MODEL IMPACT OF BLASTING PRODUCTS AT TAMPING OF BLASTING HOLES | 2012 |
|
RU2493546C1 |
TEST BENCH FOR RESEARCH OF STEMMING EJECTING FROM BLAST HOLE STATIC RESISTANCE | 2015 |
|
RU2605637C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563265C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563266C1 |
SUSPENDED TAMPING BAR OF BLAST HOLES | 2005 |
|
RU2285898C1 |
METHOD OF GOPHER HOLE FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2566522C1 |
Authors
Dates
2015-04-10—Published
2014-05-22—Filed