FIELD: blasting.
SUBSTANCE: bench comprises a high pressure chamber closed with a cover on top and a metering complex. A ball valve is mounted into a cover, which connects the high pressure chamber with a blasthole imitator installed on the cover and made in the form of a pipe with notches in the lower part. Notches imitate cracks in rock. Slots in the upper part of the pipe imitate damaged rock massif. The metering complex comprises sensors of pressure and a electrometric sensor of shift value.
EFFECT: modelling of blasting products influence at blasthole tamping.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
BENCH TO MODEL IMPACT OF BLASTING PRODUCTS AT TAMPING OF BLASTING HOLES | 2012 |
|
RU2493546C1 |
STAND FOR STUDY OF IMPACT OF EXPLOSION PRODUCTS WITH ELECTROMAGNETIC TRIGGERING DEVICE | 2014 |
|
RU2559795C1 |
BENCH FOR ANALYSIS OF EXPLOSION PRODUCTS EFFECTS THAT INCORPORATES PERCUSSION STARTER | 2014 |
|
RU2566908C1 |
TEST BENCH FOR RESEARCH OF STEMMING EJECTING FROM BLAST HOLE STATIC RESISTANCE | 2015 |
|
RU2605637C1 |
TEST BENCH FOR STUDY OF BLOCKING ABILITY OF STEMS OF EXPLOSIVE WELLS WITH SPRING STARTING DEVICE | 2014 |
|
RU2547640C1 |
TEST RIG TO STUDY EFFECT OF EXPLOSION PRODUCTS WITH LAUNCHING DEVICE | 2014 |
|
RU2553023C1 |
METHOD FOR BLASTING OF BEHCHES UNDER SHELTER AND MECHANICAL DEVICE FOR ITS REALIZATION | 2004 |
|
RU2292010C2 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563265C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563266C1 |
SPACED-FILLED TAMPING | 2009 |
|
RU2390722C1 |
Authors
Dates
2013-06-20—Published
2012-03-20—Filed