FIELD: blasting operations.
SUBSTANCE: stand for simulating the impact of the explosion products on the stemming of the blast holes comprises a high pressure chamber closed from top with a lid with a membrane connected to the simulator of the blasting hole, made in the form of a tube. The high pressure chamber is additionally provided with an electromagnetic triggering device for forced destruction of the membrane at the time of reaching the predetermined pressure in the high pressure chamber.
EFFECT: provision of a predetermined air pressure to the stemming in the simulator of the blasting hole by forced destruction of the membrane.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
TEST BENCH FOR STUDY OF BLOCKING ABILITY OF STEMS OF EXPLOSIVE WELLS WITH SPRING STARTING DEVICE | 2014 |
|
RU2547640C1 |
TEST RIG TO STUDY EFFECT OF EXPLOSION PRODUCTS WITH LAUNCHING DEVICE | 2014 |
|
RU2553023C1 |
BENCH FOR ANALYSIS OF EXPLOSION PRODUCTS EFFECTS THAT INCORPORATES PERCUSSION STARTER | 2014 |
|
RU2566908C1 |
BENCH TO STUDY LOCKING CAPABILITY OF BLASTHOLE TAMPING | 2012 |
|
RU2485599C1 |
BENCH TO MODEL IMPACT OF BLASTING PRODUCTS AT TAMPING OF BLASTING HOLES | 2012 |
|
RU2493546C1 |
TEST BENCH FOR RESEARCH OF STEMMING EJECTING FROM BLAST HOLE STATIC RESISTANCE | 2015 |
|
RU2605637C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES WITH STONE MATERIAL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563265C1 |
METHOD OF FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2563266C1 |
SPACED-FILLED TAMPING | 2009 |
|
RU2390722C1 |
METHOD OF GOPHER HOLE FORMATION OF SHORT COMBINED STEMMING OF BLAST HOLES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2566522C1 |
Authors
Dates
2015-08-10—Published
2014-05-22—Filed