METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL Russian patent published in 2018 - IPC E21B43/267 E21B43/114 E21B34/10 

Abstract RU 2667240 C1

FIELD: mining.

SUBSTANCE: invention relates to methods of hydraulic fracturing in a horizontal borehole. Method includes drilling a horizontal wellbore, determining oil-saturated reservoir intervals, opened by a horizontal trunk of a well, running in hole and fastening of a shank, interval execution of a group of perforations with the help of a hydro-sandblast perforator, performing hydraulic fracturing of the formation to form branched cracks, followed by fixing the fracture with proppant and removing the proppant from the horizontal wellbore. During the process of running the shank into the horizontal wellbore, it is equipped with a coupling ring made of a drilled material, after fixing the shank in a horizontal wellbore, a bottom-up arrangement is assembled at the wellhead at the wellhead at the lower end of the pipe string, comprising a check valve extending from the face to the mouth, a perforator, a by-pass valve, and then the tubing string is run into the horizontal wellbore at the nearest interval from the bottomhole of the oil-saturated formation. During the running process, the pipe string is provided with sealing bushings, the number of which corresponds to the number of oil-saturated intervals of the formation. Through the nozzles of a hydraulic perforator, a group of perforations in the liner is executed in front of the oil-saturated interval of the formation. Then, by backwashing, the spent liquid-sand mixture is washed from the horizontal wellbore, further, the column of pipes is moved downward and a by-pass valve is installed in the middle of the oil-saturated interval of the formation, in front of a group of perforations, with the sealing sleeve entering the sleeve ring. Drop the junk element into the pipe string, create hydraulic pressure in the pipe string, with the bypass valve bushing displacing the spring, opening the radial holes of the bypass valve and, without relieving injection pressures, perform hydraulic fracturing and then fix the cracks. After the proppant cracks are fixed in the oil-saturated reservoir interval, the proppant is removed from the horizontal wellbore, further, the column of pipes is moved up to the next oil-saturated interval of the formation and the operations described above are repeated, starting with the execution of a group of perforations in the liner and ending with the removal of proppant from the horizontal wellbore, after completion of multiple fracturing, the column of piping with the arrangement is removed from the horizontal wellbore.

EFFECT: technical result is increased reliability of the method implementation; reduced labor intensity and duration of work; increased efficiency of proppant washout from the horizontal wellbore; simplified design of equipment in the implementation of the method.

1 cl, 4 dwg

Similar patents RU2667240C1

Title Year Author Number
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT 2013
  • Ismagilov Fanzat Zavdatovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
RU2539469C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2017
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Mansurov Ajdar Ulfatovich
RU2655309C1
METHOD FOR HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2016
RU2613403C1
METHOD OF LAYER MULTIPLE HYDRAULIC FRACTURING IN INCLINED BOREHOLE 2015
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2601881C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1
METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667561C1
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2558058C1
METHOD OF MULTIPLE HYDROFRACTURING OF FORMATION IN OPEN HOLE OF HORIZONTAL WELL 2013
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2537719C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT WITH CYCLIC STEAM SOAKING 2017
  • Zaripov Azat Timeryanovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zauzyatovich
  • Girfanov Ildar Ilyasovich
RU2645058C1
FORMATION METHOD OF VERTICALLY DIRECTED FRACTURE AT HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION 2011
  • Makeeva Natal'Ja Ivanovna
RU2510456C2

RU 2 667 240 C1

Authors

Nasybullin Arslan Valerevich

Salimov Oleg Vyacheslavovich

Ziyatdinov Radik Zyauzyatovich

Dates

2018-09-18Published

2017-10-12Filed