FIELD: oil and gas industry.
SUBSTANCE: group of inventions relates to secondary methods of HC extraction from the underground reservoirs, in particular to methods of the hydraulic fracturing without the proppant, as well as to the selective injection to some underground reservoirs. As per the method the selective stratum of stratums set is isolated along the well bore in the underground section from rest stratums of the set. The selective injection is used to supply fluid to the selective stratum in the stratums set. At that the fluid is supplied to the selective stratum regardless of the fact weather the fluid was supplied to the neighbouring stratum of the stratums set. Isolation means isolation of the stratums set from pressure acting on the selective stratum when the fluid is supplied to the selective stratum. Hydraulic fracturing of each stratum of the stratums set is performed. Testing of the stepwise pressure variation is performed for at least one stratum of the stratums set. Testing of the stepwise pressure variation includes opening of one of the reservoir stratums in the stratums set by the fluid injection to the well bore. At that one of the stratums is opened at specified pressure. The fluid backflow is ensured such that one of the reservoir stratums is closed. Re-opening of the one of the reservoir stratums is performed for one or more times. At that the reservoir opening pressure is reduced each time. Mode is determined when the reservoir opening pressure is below the injection pressure at which the reservoir injection ensures the fluid supply to the stratums set. As response to determination that the reservoir re-opening pressure is below the injection pressure the test is completed by stepwise pressure variation.
EFFECT: increased efficiency of HC production.
21 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF PERMEABLE UPPER JURASSIC DEPOSITS USING HORIZONTAL WELLS WITH MULTI-STAGE HYDRAULIC FRACTURING AND MAINTAINING RESERVOIR PRESSURE DUE TO HIGH-PRESSURE AIR INJECTION | 2021 |
|
RU2764128C1 |
METHOD FOR HEAVY AND/OR HIGHLY-VISCOUS HYDROCARBON PRODUCTION FROM UNDERGROUND DEPOSIT | 2006 |
|
RU2310744C1 |
METHOD OF MINING-WELL TAR PRODUCTION AND PROCESS EQUIPMENT SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2574434C1 |
METHOD FOR DEVELOPMENT OF LOW-PERMEABILITY OIL-GAS FORMATIONS | 2015 |
|
RU2579039C1 |
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS | 2007 |
|
RU2357073C2 |
METHOD OF OIL-BEARING BED DEVELOPMENT | 2016 |
|
RU2613713C1 |
PROCESS OF HYDRAULIC FRACTURING OF FORMATIONS IN WELLS | 2000 |
|
RU2219335C2 |
ELIMINATION METHOD OF WELLS | 2018 |
|
RU2693623C1 |
DETERMINING TREATMENT FLUID COMPOSITION USING MINI-RESERVOIR MODEL | 2014 |
|
RU2662824C2 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2007 |
|
RU2349740C2 |
Authors
Dates
2015-04-20—Published
2010-11-03—Filed