FIELD: oil-and-gas industry.
SUBSTANCE: this process comprises measurement of injection well capacity, feed of products of one or several production wells for preliminary water disposal. Measured are density of green oil and gas, green oil water content are measured in the well. Here said products are divided into partially dewatered oil, gas and water. Partially dewatered oil and gas are fed in gathering main. Disposed water is fed into injection well. Compatibility of disposed water with water of seam wherefrom pumping from injection well is made is defined. If threes are compatible, injection well is equipped with the device to create water pressure sufficient for water injection into seam, for example, with electrically-driven rotary pump. Said device allows varying of feed capacity by frequency-controlled drive for said pump. It is set to minimum feed to define the compliance of disposed water quality with the seam geological properties. At poor water quality, it is directed to gathering main or, at sufficient quality, it is forced into injection well. Disposed water amount is defined. Then, device feed capacity is increased either continuously or in stepwise manner to create water pressure. It is increased unless disposed water quality satisfied the seam geological properties.
EFFECT: higher process efficiency.
3 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLUSTER RELEASE AND UTILISATION OF PRODUCED WATER | 2015 |
|
RU2588234C1 |
DEVICE FOR ARRANGEMENT OF CLUSTER DISCHARGE AND RECYCLING OF FORMATION WATER | 2018 |
|
RU2688706C1 |
METHOD FOR DISCHARGE OF ASSOCIATED-PRODUCED WATER AND GAS SEPARATELY IN CLUSTER OF WELLS OF OIL DEPOSIT | 2019 |
|
RU2713544C1 |
UNIT SET FOR CLUSTER SEPARATION | 2020 |
|
RU2741296C1 |
METHOD FOR PRELIMINARY DISCHARGE OF PRODUCED WATER AND A PIPE PHASE DIVIDER FOR ITS IMPLEMENTATION | 2021 |
|
RU2763097C1 |
CONTROL METHOD FOR PRODUCTION AND ACTIONS SYSTEM AT WELLS CLUSTER | 2014 |
|
RU2548460C1 |
METHOD OF WELL-STREAM GATHERING FROM OIL DEPOSIT | 2008 |
|
RU2366812C1 |
COMPLEX CLUSTER INSTALLATION FOR DEHYDRATION OF OIL AND PURIFICATION AND UTILISATION OF PRODUCED RESERVOIR WATER | 2009 |
|
RU2411055C1 |
SYSTEM FOR HEAVY OIL AND NATURAL BITUMEN DEPOSIT ARRANGEMENT (VERSIONS) | 2012 |
|
RU2503806C1 |
METHOD FOR PREPARATION AND TRANSPORTATION OF PRODUCTS OF WELL PRODUCTION AT MATURE OIL DEPOSITS AND SYSTEM OF IMPLEMENTATION | 2018 |
|
RU2690465C1 |
Authors
Dates
2015-04-20—Published
2014-03-03—Filed