FIELD: mining.
SUBSTANCE: method comprises pumping oil from a lower layer by the centrifugal pump with feeding under pressure of liquid jet ejector into the nozzle. Using this ejector the oil from the upper layer is simultaneously pumped with oil from the lower layer through the column of oil-well tubing to the wellhead. At that the oil from the lower layer is pumped to the nozzle of the liquid jet ejector with laminar flow of oil flow with low gas content. Pumping oil at the wellhead is carried out with a centrifugal pump with the pressure given by the condition of the pressure distribution on the rise of the oil masses from the lower layer to the nozzle of the liquid jet ejector and oil mixture from both layers along the column of oil-well tubing and the work of the liquid jet ejector. The flow cross-sections of the nozzle and the mixing chamber of the liquid jet ejector are set directly proportional to production rate of the lower layer and the production rate of both layers of the wells, respectively.
EFFECT: increase in reliability of operation of the well.
3 cl, 2 dwg, 1 ex
Authors
Dates
2015-05-10—Published
2014-05-15—Filed