FIELD: oil and gas industry.
SUBSTANCE: installation comprises underground equipment assembly run in the well using the pipes string, including funnel-positioner, lower packer, reducer-positioner, device of injection distribution, top packer, extension. Device of injection distribution contains casing and removable parts, is equipped with to independent pressure gauge, middle independent pressure gauge, and bottom independent pressure gauge. Top and bottom unions are installed in the removable part of the device of injection distribution with possibility of both unions removal by one round run operation.
EFFECT: assurance of possibility of information acquisition on injection pressure upstream and downstream each union for long time period, reception of reliable data on injection mode, increased process reliability.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTROLLED PUMPING DOWN TO FORMATIONS AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2679406C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
METHOD AND DEVICE FOR ADJUSTABLE INJECTION OF FLUID TO LAYERS WITH AUTOMATED MEASURING OF PROCESS PARAMETERS | 2015 |
|
RU2610484C9 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD OF CONTROLLED INJECTION OF LIQUID THROUGH FORMATION (VERSIONS) | 2016 |
|
RU2634317C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF INJECTION WELL | 2021 |
|
RU2766479C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
METHOD FOR ADJUSTABLE LIQUID INJECTION IN PRODUCTION FORMATION | 2016 |
|
RU2630320C1 |
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION | 2011 |
|
RU2485293C1 |
METHOD OF CONTROLLING PROCESS OF PUMPING WORKING AGENT TO MAINTAIN MEDIUM PRESSURE IN MULTI-LAYER WELL | 2017 |
|
RU2670814C9 |
Authors
Dates
2015-06-10—Published
2014-07-01—Filed