FIELD: oil and gas industry.
SUBSTANCE: invention relates to the oil industry and can be used to inject a working agent on a multi-layer deposit with one well. Method includes the downhole of a pipe string, the injection of a working agent, directing it through a regulating device, and a measuring transducer, obtaining information on the measurement from the measuring transducer and determining the technological parameters of the working agent for the formation, and if they differ from the design value, the cross-section of the regulating device is changed until the design value of the technological parameters for each of the layers is reached. Measuring transducer and the regulating device are connected to the depth control unit of the injection of the working agent (DU), which transmits the value of technological parameters to the control station located at the wellhead, where this information is fed to the control station controller (CSC) and the ground control unit, which receives and processes the information, then analyzes and generates a control signal for the regulating device and sends it to the DU via the communication channel, all information received and transmitted in real time is reflected on the CSC, and then stored on a memory device with the ability to view all the information received at any time, while the DU collects and processes information from the regulating device and the measuring transducer, analyzes the information received and in accordance with the program algorithm, if necessary, an urgent solution to the problem, generates a control signal for the regulating device, and sends the received information via the communication channel through the CSC to the ground control unit.
EFFECT: technical result consists in increasing the efficiency of controlling the process of pumping a working agent into a multi-layer well.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUSLY-SEPARATE DOWNLOADING OF THE WORKING AGENT, INSTALLATION AND REGULATORY DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2681719C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2440488C2 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
BOREHOLE UNIT WITH FIELD EXPLOITATION MONITORING AND CONTROL SYSTEM | 2014 |
|
RU2569390C1 |
METHOD FOR SIMULTANEOUS SEPARATE MULTIPLE-ZONE WELL OPERATION | 2006 |
|
RU2313659C1 |
METHOD OF SIMULTANEOUS-SEPARATE LIQUID INJECTION AS PER RESERVOIRS WITH POSSIBILITY TO MEASURE PARAMETERS OF INJECTED LIQUID AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2552405C1 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD AND DEVICE FOR ADJUSTABLE INJECTION OF FLUID TO LAYERS WITH AUTOMATED MEASURING OF PROCESS PARAMETERS | 2015 |
|
RU2610484C9 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
METHOD OF CONTROLLED INJECTION OF LIQUID THROUGH FORMATION (VERSIONS) | 2016 |
|
RU2634317C1 |
Authors
Dates
2018-10-25—Published
2017-10-11—Filed