FIELD: oil and gas industry.
SUBSTANCE: method comprises pumping into the annular space of the well of emulsifier at a rate of 60-80 g per 1 m3 of extracted water, discharge of gas from annular space into the air. After formation in annular space of finely dispersed water-oil emulsion it is flushed into the tubing string by heat carrier until full removal of asphaltene-resin-paraffin deposits.
EFFECT: well cleaning efficiency improvement.
3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL CLEANING OF ASPHALT-TAR-PARAFFIN AND SULFIDE DEPOSITS | 2004 |
|
RU2266392C2 |
METHOD OF REMOVING DEPOSITS FROM WELL EQUIPPED WITH ELECTRIC CENTRIFUGAL PUMP | 2016 |
|
RU2603982C1 |
METHOD OF REMOVING DEPOSITS FROM WELL EQUIPPED WITH BOTTOM-HOLE PUMP | 2016 |
|
RU2603866C1 |
PROCESSING TECHNIQUE OF WELLS AND ITS WELL BOTTOM ZONES FOR REMOVING OF IRON SULPHIDES | 2007 |
|
RU2359108C2 |
METHOD FOR REMOVING ASPHALTENORESINPARAFFIN DEPOSITION FROM EQUIPMENT IN WELLS | 1998 |
|
RU2129651C1 |
METHOD OF WELL OPERATION AND DEVICE FOR IMPLEMENTATION THEREOF | 2017 |
|
RU2704087C2 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD FOR REMOVING OF ASPHALT-RESIN-WAX ACCUMULATION | 1994 |
|
RU2067160C1 |
METHOD FOR CONTROL OF ASPHALT-RESIN-PARAFFIN DEPOSITS FORMATION IN LIFT PIPES DURING GASLIFT OPERATION OF WELLS | 2021 |
|
RU2755778C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
Authors
Dates
2015-06-10—Published
2014-09-04—Filed