METHOD OF OIL WELL OPERATION Russian patent published in 2015 - IPC E21B43/00 E21B34/02 

Abstract RU 2553689 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes cyclic forced gas pumping from the annulus and pressure decreasing in it. Periodically the well flow header is partially closed. Pressure upstream the shutdown element of the header is increased to ensure the produced fluid supply to the expansion chamber of the tank with resilient element and to accumulate mechanical energy in the expansion chamber. Then full opening of the header shutdown element is performed. Pressure upstream the shutdown element is decreased, and fluid is displaced from the expansion chamber to the header due to the accumulated mechanical energy. Each cyclic volume increasing of part of the tank above the expansion chamber ensures annulus gas suction in it, and this volume decreasing ensures gas displacement to the header.

EFFECT: possibility of gas pumping from the annulus in tubing string of the well for different methods of mechanised oil production.

1 dwg

Similar patents RU2553689C1

Title Year Author Number
DEVICE INTENDED FOR GAS WITHDRAWAL FROM ANNULAR SPACE IN OIL WELL 2014
  • Valeev Asgar Maratovich
  • Fatkullin Salavat Mirgasimovich
  • Sevast'Janov Aleksandr Vladimirovich
  • Nigaj Jurij Valentinovich
  • Akhmetzjanov Ruslan Malikovich
RU2567571C1
METHOD FOR OIL EXTRACTION BY SUCKER-ROD PUMPING UNITS 2019
  • Urazakov Kamil Rakhmatullovich
  • Rabaev Ruslan Uralovich
  • Belozerov Viktor Vladimirovich
  • Molchanova Veronika Aleksandrovna
  • Davletshin Filyus Fanuzovich
RU2720764C1
INSTALLATION FOR DUAL OIL WELL OPERATION AND METHOD OF MEASURING FORMATION PRODUCTION 2017
  • Valeev Asgar Maratovich
RU2658085C1
DOWNHOLE PUMP UNIT FOR PRODUCTION OF BITUMINOUS OIL 2015
  • Valeev Asgar Maratovich
  • Ramazanov Gabibyan Salikhyanovich
  • Ivanov Aleksandr Aleksandrovich
  • Akhmetzyanov Ruslan Malikovich
  • Mingulov Shamil Grigorevich
  • Ryabov Sergej Sergeevich
RU2595032C1
METHOD FOR SEPARATE PRODUCTION RATE MEASUREMENT AT DUAL OPERATION OF BOREHOLE COMPLETE WITH ELECTRIC CENTRIFUGAL PUMP 2014
  • Valeev Asgar Maratovich
  • Kostilevskij Valerij Anatol'Evich
  • Guzairov Il'Dar Shamilevich
  • Medvedev Petr Viktorovich
  • Khajretdinov Rishat Rasulovich
RU2567249C1
METHOD OF WELL OIL PRODUCTION 2023
  • Petrakovskij Denis Valerievich
RU2812819C1
BOREHOLE PUMPING UNIT FOR THE EXTRACTION OF BITUMINOUS OIL 2021
  • Ponomarev Aleksandr Iosifovich
  • Shayakhmetov Ajrat Ilfatovich
  • Valeev Asgar Maratovich
RU2773651C1
PUMPING PLANT FOR GAS WITHDRAWAL FROM ANNULAR SPACE IN OIL WELL 2016
  • Valeev Murad Davletovich
  • Akhmetzyanov Ruslan Malikovich
  • Shamenin Denis Valerevich
  • Bagautdinov Marsel Azatovich
RU2630490C1
METHOD OF PUMPING OIL PRODUCTION WITH HIGH GAS FACTOR 2016
  • Valeev Murad Davletovich
  • Ramazanov Gabibyan Salikhyanovich
  • Nizamov Dinar Ilgizovich
  • Ganeeva Svetlana Magnavievna
RU2627797C1
OIL, GAS AND WATER IN OIL DEPOSITS WELLS FLOW RATES MEASURING METHOD 2017
  • Valeev Asgar Maratovich
  • Akhmetgaliev Rinat Zakirovich
  • Bagautdinov Marsel Azatovich
  • Timin Vladimir Aleksandrovich
RU2677725C1

RU 2 553 689 C1

Authors

Valeev Asgar Maratovich

Fatkullin Salavat Mirgasimovich

Sevast'Janov Aleksandr Vladimirovich

Rabartdinov Al'Bert Zagitovich

Nigaj Jurij Valentinovich

Dates

2015-06-20Published

2014-02-07Filed