FIELD: oil and gas industry.
SUBSTANCE: before shank running-in horizontal ending is filled with clay mud of increased viscosity. The shank is equipped with centralisers in the densest parts in intervals of caving-in areas and is run-in at drill tubes with string disconnector up to interval of the horizontal ending commencement at low rate so that the string is moved constantly. During running-in of the shank the drill mud is levelled periodically. Upon running-in the process is withhold until the shank is set, setting of the shank is controlled, then the shank and borehole annulus are washed, drill tubes are screwed off from the shank, cement head is screwed on, cement solution is pumped through the shank to the borehole annulus and the shank borehole annulus is cemented. Upon running-out of drill tubes the process is withhold for the period of cement setting and hardening, cement remains in the shank and its fittings are drilled out, washed and the well is developed.
EFFECT: preventing accident rate at running-in of the shank in conditions of caving-in rocks in the well.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HORIZONTAL OIL WELL CONSTRUCTION | 2013 |
|
RU2520033C1 |
METHOD OF CONSTRUCTION OF HORIZONTAL WELL | 2014 |
|
RU2551592C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541981C1 |
COMPLETION METHOD OF HORIZONTAL WELL | 2014 |
|
RU2541979C1 |
CONSTRUCTION OF OIL PRODUCTION WELL | 2013 |
|
RU2524089C1 |
CASING CEMENTING METHOD | 0 |
|
SU1737101A1 |
METHOD OF WELL CONSTRUCTION IN COMPLICATED MINING AND GEOLOGICAL CONDITIONS FOR DRILLING AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531409C1 |
WELL CONSTRUCTION METHOD | 2014 |
|
RU2541978C1 |
METHOD OF COMPLETING AUXILIARY WELLBORE SHAFT CONSTRUCTION AND RIG TO THIS END | 2009 |
|
RU2391491C1 |
METHOD OF SHANK INSTALLATION IN WELL | 2019 |
|
RU2725398C1 |
Authors
Dates
2015-06-20—Published
2014-10-15—Filed