FIELD: oil and gas industry.
SUBSTANCE: under this method the field is drilled according to row system with triangle grid of wells. Work agent is injected in the injection wells. Oil production is performed from production wells. At initial stage of the field development the production reservoir is presented by two horizons, if divided by central separating row of injecting wells with spacing between wells at least 300 m. Central separating row is arranged along line of maximum pay structure, the injection wells in it are made with opening by common filter of the both horizons. The closest first row of the production wells is drilled at distanced from the central row at least 500 m. Other areas of the reservoir are drilled with spacing between wells 300-400 m. After injection of the central row of the injection wells to 0.4-0.7 unit fractions of the pore volume to nearest rows of the production wells at least 90% wells of the central row are shutdown. After oil withdrawal at the entire field to 90% of initial oil productive capacity between the central separating row of the injection wells and nearest row of the production wells the sealing row of the production wells is drilled. Wells of the central row are switched to production at top horizon. During watering of the production wells of the first row to 98% they are switched to water injection.
EFFECT: increased oil recovery factor of the field.
2 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF STRUCTURAL OIL DEPOSIT | 2019 |
|
RU2704688C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2476667C1 |
METHOD FOR DEVELOPING OIL FIELD COMPOSED OF NON-UNIFORM LAYERED BEDS | 0 |
|
SU1756545A1 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTAL WELLS | 2011 |
|
RU2474677C1 |
METHOD FOR EXTRACTING OIL DEPOSIT WITH CARBONATE MANIFOLDS OF LOW PRODUCTIVENESS | 2002 |
|
RU2227207C2 |
MULTI-LAYER DEPOSITS WITH HARD-TO-RECOVER OIL RESERVES DEVELOPMENT METHOD BY THE COMPACTING GRID METHOD | 2018 |
|
RU2678337C1 |
BOREHOLE RUNNING IN METHOD | 1992 |
|
RU2039217C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513469C1 |
DEVELOPMENT OF MINOR OIL DEPOSITS | 2013 |
|
RU2524703C1 |
MULTI-SITE OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459935C1 |
Authors
Dates
2015-07-10—Published
2014-08-25—Filed