FIELD: transport.
SUBSTANCE: invention relates to flyover erection hoisting gear in the form of bridge tower crane. The hoisting gear includes flyover span with footway cantilevers, railway carts with wickets, tower with rigid girder pivotally installed on front end of span where semicircular retainer is fixed. The tower is held by guys fixed by rear end of the span. Along the axis of the span, only two wrenches with system of pulleys are installed, the rigid girder is provided with blocks along its axis and at ends, and on the footway cantilevers four wrenches with ropes are installed.
EFFECT: possibility of device turnover is excluded during operation, and simultaneous erection of flyover flat bearing and span using this device is achieved.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
COLLAPSIBLE CANTILEVER CRANE | 2021 |
|
RU2774693C1 |
METHOD OF MOUNTING IMZH-500 RAILROAD BRIDGE WITH COLLAPSIBLE RAILWAY CANTILEVER CRANE FOR INSTALLATION OF SUPPORT AND SPANS IN ONE PROCESS CYCLE | 2020 |
|
RU2740595C1 |
CRANE FOR MOUNTING RAILWAY BRIDGE FRAMEWORK | 2002 |
|
RU2225829C2 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
METHOD OF TRANSPORTATION OF REM-500 EQUIPMENT BY RAIL | 2017 |
|
RU2657636C1 |
METHOD OF INSTALLING FLYOVER ON SCREW PILES | 2017 |
|
RU2659287C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
FRAMED BRIDGE SUPPORT | 1999 |
|
RU2149946C1 |
APPARATUS FOR MOUNTING THE FERROCONCRETE COLUMNS AND CROSS-BAR BLOCKS OF BRIDGE PIERS | 0 |
|
SU912822A1 |
Authors
Dates
2015-07-20—Published
2013-09-02—Filed