FIELD: construction of bridges.
SUBSTANCE: invention relates to construction of bridges and can be used in assembling collapsible railway bridges, namely, metal flyovers, by the "head first" method on land and in a water stream. The collapsible cantilever crane consists of a base part, a main beam, flexible rods, an undercarriage, a counterweight platform, a counterweight, block and tackle systems, winches, electrical equipment, a power unit, beams, a winch control panel. Spacers are installed between the flanges of the shoes and the base part of the main beam, process equipment is placed on the main beam and the base part, including a support frame, a mobile beam, a crane for installing capstans and pile sections, an additional second block and tackle system, a traverse for rigging the crossbar of the support, a retractable bracket, mounting winches, and cassettes for pile sections.
EFFECT: productivity of the crane is increased.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING IMZH-500 RAILROAD BRIDGE WITH COLLAPSIBLE RAILWAY CANTILEVER CRANE FOR INSTALLATION OF SUPPORT AND SPANS IN ONE PROCESS CYCLE | 2020 |
|
RU2740595C1 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
CRANE FOR MOUNTING RAILWAY BRIDGE FRAMEWORK | 2002 |
|
RU2225829C2 |
HOISTING GEAR FOR FLYOVER ERECTION | 2013 |
|
RU2556777C2 |
METHOD OF INSTALLING FLYOVER ON SCREW PILES | 2017 |
|
RU2659287C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
FRAMED BRIDGE SUPPORT | 1999 |
|
RU2149946C1 |
0 |
|
SU118368A1 | |
METHOD OF INSTALLING BRIDGE SPAN STRUCTURES OF REM-500 METAL OVERHEAD | 2017 |
|
RU2673345C1 |
SET FOR COUNTERBALANCED SUSPENSION ASSEMBLING OF BRIDGE SPAN STRUCTURE ASSEMBLED FROM PREFABRICATED BLOCKS | 0 |
|
SU1065518A1 |
Authors
Dates
2022-06-21—Published
2021-06-07—Filed