FIELD: oil and gas industry.
SUBSTANCE: device includes a rope and an enclosure in the form of floating sections of a guard boom, which are connected to each other Ends of extreme sections and the rope are fixed on opposite river banks. The rope is fixed above river surface and sliding rings are freely put on it. Ends of the enclosure and connection points of the sections are connected to the corresponding rings by means of carriers of the corresponding length. An installation method of the device consists in installation of the enclosure at an angle to river flow direction. First, the rope with rings put on it is drawn above the river surface. The enclosure is towed along the rope to the opposite bank and sections are connected in series to the corresponding rings by means of the carriers.
EFFECT: reliability, durability and efficiency of installation of an enclosure to prevent oil spreading.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INSTALLING BOOM | 2022 |
|
RU2808239C1 |
DEVICE FOR LOCALIZATION OF OIL SPILLS IN WATER RESERVOIRS | 2000 |
|
RU2192516C2 |
METHOD OF OIL GATHERING FROM UNDER ICE COVER IN FLOW BASIN | 2002 |
|
RU2224842C1 |
METHOD FOR CLEANING WATER SURFACE OF OIL PRODUCTS | 2004 |
|
RU2268337C2 |
METHOD OF PROTECTION OF RESERVOIR COVERED WITH ICE FROM OIL OVERFLOW | 2008 |
|
RU2370593C1 |
VARIABLE BUOYANCY BOOM | 2015 |
|
RU2599560C1 |
BOOM BARRIER OF VARIABLE BUOYANCY | 2002 |
|
RU2221109C1 |
DEVICE FOR COLLECTION OF GARBAGE AND ELIMINATION OF EMERGENCY OIL AND OIL PRODUCT SPILLS FROM WATER SURFACE | 2018 |
|
RU2735845C1 |
DEVICE FOR PREVENTION OF UNDERWATER LEAKS FROM OIL WELLS AND LOCALIZATION ON THE WATER SURFACE | 2016 |
|
RU2623626C1 |
METHOD FOR ELIMINATING THE CONSEQUENCES OF ACCIDENTAL SPILLS OF OIL AND OIL PRODUCTS IN THE AREAS OF DEVELOPMENT OF OIL AND GAS FIELDS ON THE SEA SHALLOW SHELF | 2022 |
|
RU2797093C1 |
Authors
Dates
2015-07-20—Published
2014-04-03—Filed