METHOD TO PRODUCE HIGH-VISCOSITY OIL AND BITUMEN Russian patent published in 2015 - IPC E21B43/267 E21B43/24 

Abstract RU 2560016 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes pad drilling of the upper, middle and lower well with vertical sections and horizontal bores placed in parallel to each other, installing electrodes and submersible centrifugal pump into the wells, heating reservoir with electric current through the installed electrodes, extracting heated high-viscous oil and bitumen by submersible centrifugal pump. Horizontal bores of the wells are drilled in direction of maximum stress σmax in rocks composing the reservoir. Along the whole length of horizontal in the upper well hydraulic fracturing is performed with longitudinal cracks and their further fixing with proppant agent made of current-conductive material. Vertical wells are drilled with crossing of initial and final sections in the upper well horizontal bore within the interval of hydraulic fracturing. To vertical wells, to the interval of crossing with the upper well horizontal bore electrodes are run down, and sucker-rod strings are used as the above electrodes. At the well mouth electrodes are connected to the electric substation, and then to the vertical section of the middle well a submersible centrifugal pump is run down at the pipe string. The reservoir is heated through horizontal bore of the upper well and heated high-viscosity oil and bitumen are extracted from the middle well horizontal bore through the pipe string by the submersible centrifugal pump. Upon completed workout of high-viscosity oil and bitumen are extracted from at the section between horizontal bores of the upper and middle well the electrodes are disconnected from the electric substation and removed from vertical wells, and from vertical section of the middle well the pipe string with the submersible centrifugal pump is removed. Then in horizontal section of the middle well hydraulic fracturing is performed with longitudinal cracks and their further fixing with proppant agent made of current-conductive material. Vertical wells are drilled additionally to crossing with initial and final sections of the middle well in the interval of hydraulic fracturing; to vertical wells in interval with their crossing with horizontal section of the middle well electrodes are run down and at well mouths electrodes are connected to the electric substation. The submersible centrifugal pump is run down to the vertical section of the lower well; the reservoir is heated through middle well horizontal bore and heated oil is extracted from the lower well horizontal bore through the pipe string by the submersible centrifugal pump.

EFFECT: improved efficiency of heating for the reservoir with high-viscosity oil and bitumen, increased coverage of the reservoir by thermal effect and uniform heating, increased yield of heated oil and improved reliability of the method implementation.

2 dwg

Similar patents RU2560016C1

Title Year Author Number
METHOD OF PRODUCTION OF HIGH VISCOUS OIL AND BITUMEN 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Aleksandrov Georgij Vladimirovich
RU2564311C1
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSIT 2014
  • Fajzullin Ilfat Nagimovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
RU2560040C1
METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSITS DEVELOPMENT 2015
  • Amerkhanov Marat Inkilapovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2597303C1
METHOD OF COMPLETION AND DEVELOPMENT OF STEAM HORIZONTAL WELLS PRODUCING HIGH-VISCOSITY OIL 2018
  • Amerkhanov Marat Inkilapovich
  • Akhmetzyanov Fanil Muktasimovich
  • Akhmetshin Nail Munirovich
RU2694317C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT 2017
  • Amerkhanov Marat Inkilapovich
  • Akhmadullin Robert Rafaelovich
  • Latfullin Rustem Ruslanovich
  • Akhmetzyanov Fanil Muktasimovich
  • Ibragimov Danil Abelkhasimovich
RU2689102C2
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL AND BITUMEN DEPOSITS 1994
  • Zakiev Gambar Zakievich
RU2085715C1
BOREHOLE PUMPING UNIT FOR THE EXTRACTION OF BITUMINOUS OIL 2021
  • Ponomarev Aleksandr Iosifovich
  • Shayakhmetov Ajrat Ilfatovich
  • Valeev Asgar Maratovich
RU2773651C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES 2010
  • Ramazanov Rashit Gaznavievich
  • Bakirov Il'Shat Mukhametovich
  • Zijatdinov Radik Zjauzjatovich
  • Strakhov Dmitrij Vital'Evich
  • Osnos Vladimir Borisovich
RU2442883C1
PROCEDURE FOR EXTRACTION OF HIGH VISCOUS OIL FROM DEVIATING HOLE BY METHOD OF STEAM CYCLIC PUMPING INTO RESERVOIR 2010
  • Bakirov Il'Shat Mukhametovich
  • Amerkhanov Marat Inkilapovich
  • Shesternin Valentin Viktorovich
RU2436943C1
DOWNHOLE PUMP UNIT FOR PRODUCTION OF BITUMINOUS OIL 2015
  • Valeev Asgar Maratovich
  • Ramazanov Gabibyan Salikhyanovich
  • Ivanov Aleksandr Aleksandrovich
  • Akhmetzyanov Ruslan Malikovich
  • Mingulov Shamil Grigorevich
  • Ryabov Sergej Sergeevich
RU2595032C1

RU 2 560 016 C1

Authors

Makhmutov Il'Gizar Khasimovich

Salimov Oleg Vjacheslavovich

Zijatdinov Radik Zjauzjatovich

Girfanov Il'Dar Il'Jasovich

Dates

2015-08-20Published

2014-07-04Filed