FIELD: oil production industry. SUBSTANCE: method implies extraction of viscous and high-viscous petrobitumens by heating reservoir with high-frequency electric current. Procedure is as follows. Drilled out are at least three wells with vertical and horizontal sections of bore-holes directed parallel to each other. Installed into extreme wells are electrodes, and installed into intermediate well is reversible electric centrifugal pump. After heating of oil bed, heated product of intermediate well is directed into part of bed not covered by electric field with subsequent pumping-out of heated oil to day surface by reversing operation of pump. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PRODUCE HIGH-VISCOSITY OIL AND BITUMEN | 2014 |
|
RU2560016C1 |
METHOD OF PRODUCTION OF HIGH VISCOUS OIL AND BITUMEN | 2014 |
|
RU2564311C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OILS OR BITUMENS | 2010 |
|
RU2418163C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSIT | 2014 |
|
RU2560040C1 |
METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSITS DEVELOPMENT | 2015 |
|
RU2597303C1 |
METHOD FOR DEVELOPMENT OF HIGH DEPOSITS OF HIGH VISCOSITY OIL WITH WATER CONSISTENT ZONES | 2017 |
|
RU2663524C1 |
METHOD FOR DEVELOPMENT OF HIGH DEPOSITS OF HIGH VISCOSITY OIL WITH WATER CONSISTENT ZONES | 2018 |
|
RU2684262C1 |
METHOD OF DEVELOPMENT OF HARD-TO-RECOVER HYDROCARBON DEPOSITS | 2020 |
|
RU2741644C1 |
METHOD FOR EXTRACTING DEPOSITS OF BITUMEN AND HIGHLY VISCOUS OIL AND COMPLEX SYSTEM OF EQUIPMENT FOR REALIZATION OF SAID METHOD | 2004 |
|
RU2285116C2 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2007 |
|
RU2350747C1 |
Authors
Dates
1997-07-27—Published
1994-07-18—Filed