METHOD FOR DETERMINING LOCATION OF UNAUTHORISED CONNECTION OF LOAD OF UNKNOWN POWER TO POWER TRANSMISSION LINE Russian patent published in 2015 - IPC G01R31/00 G01R17/10 

Abstract RU 2561410 C1

FIELD: electricity.

SUBSTANCE: invention describes methods for determining the location of unauthorised connection of load of unknown power to a symmetrical or asymmetrical power transmission line. In such power transmission line of a three-wire design, current and voltage of industrial frequency are distributed throughout its length as per linear laws. A connection point of load of unknown power to the power transmission line is determined as a result of an algorithm calculation, which allows obtaining values of active power at the beginning and at the end of the power transmission line, on the basis of which values of lengths are determined from the beginning and from the end of the power transmission line, where there is the load connection point. Data on voltages and currents, active power in the power transmission line can be obtained through interface devices or sensors made in the form of voltage and current transformers, watt meters or in the form of voltage dividers and alternating-current shunts. As a result of data processing, a value of length of the power transmission line, where there is the connected load, is formed in the processor.

EFFECT: method will allow improving efficient determination of location of unauthorised connection of load of unknown power to PTL.

2 cl, 6 dwg

Similar patents RU2561410C1

Title Year Author Number
METHOD OF DETERMINING POINT OF UNAUTHORISED CONNECTION OF LOAD TO POWER TRANSMISSION LINE 2015
  • Kozlov Viktor Aleksandrovich
  • Bolshanin Georgij Anatolevich
  • Kozlova Oksana Aleksandrovna
RU2577557C1
METHOD FOR DETERMINING POINT OF UNAUTHORISED CONNECTION OF LOAD TO POWER TRANSMISSION LINE 2015
  • Kozlov Viktor Aleksandrovich
  • Bolshanin Georgij Anatolevich
  • Kozlova Oksana Aleksandrovna
RU2598684C1
METHOD FOR COORDINATION OF LONG FOUR-WIRE NON-HOMOGENEOUS ASYMMETRICAL HIGH-VOLTAGE POWER TRANSMISSION LINE WITH SUPERCONDUCTING INSERTION WITH ELECTRICAL LOAD 2013
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2557797C2
METHOD FOR MATCHING OF THREE-WIRE POWER TRANSMISSION LINE WITH ELECTRICAL LOAD 2013
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2547271C2
METHOD FOR MATCHING NON-HOMOGENEOUS NON-INSULATED THREE-WIRE POWER TRANSMISSION LINE TO ELECTRICAL LOAD 2012
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2502176C1
METHOD FOR MATCHING ASYMMETRICAL FOUR-WIRE HIGH VOLTAGE POWER TRANSMISSION LINE TO ELECTRICAL LOAD 2013
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2551362C2
METHOD FOR MATCHING SYMMETRICAL FOUR-WIRE POWER TRANSMISSION LINE TO ELECTRICAL LOAD 2012
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2520578C1
METHOD FOR MATCHING NON-SYMMETRICAL THREE-WIRE POWER TRANSMISSION LINE WITH ELECTRIC LOAD AT FREQUENCIES OF DEFINITE HARMONIC COMPONENTS OF CURRENT AND VOLTAGE 2013
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2546977C2
METHOD OF MATCHING THREE-WIRE POWER TRANSMISSION LINE WITH ELECTRIC LOAD AT FREQUENCIES OF PRONOUNCED HARMONIC COMPONENTS OF CURRENTS AND VOLTAGES 2012
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2488218C1
METHOD FOR MATCHING OF THREE-WIRE POWER LINE WITH ELECTRICAL LOAD 2011
  • Kozlov Viktor Aleksandrovich
  • Bol'Shanin Georgij Anatol'Evich
RU2490767C2

RU 2 561 410 C1

Authors

Kozlov Viktor Aleksandrovich

Bol'Shanin Georgij Anatol'Evich

Dates

2015-08-27Published

2014-06-10Filed