FIELD: construction.
SUBSTANCE: invention relates to the field of construction of surface pipelines and may be used in organization of pipeline supports under complex geological conditions, for instance, under permafrost conditions. A fixed support of a pipeline includes a coil, installed via units of electric insulation to two pairs of stands, made as capable of correction of their height for adjustment of height position and angle of support inclination fixed at a single-level capping, rigidly resting against a piled foundation. The coil is a pipe with an outer jacket and a layer of heat insulation with an inner shell fixed on it in a central part, to which longitudinal and transverse stiffening ribs are fixed, to provide for the possibility of coil fixation to stands. Stands are fixed to the capping via support flanges.
EFFECT: technical result consists in provision of stability of a structure and redistribution of load from a pipeline at a piled foundation.
10 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
PIPELINE MOVABLE SUPPORT AND ITS SUPPORT UNIT | 2014 |
|
RU2572743C2 |
METHOD TO INSTALL FIXED SUPPORT INTO DESIGN POSITION WITH POSSIBILITY TO ADJUST HEIGHT POSITION IN PROCESS OF OPERATION | 2014 |
|
RU2572428C2 |
SUSPENSION SUPPORT FOR SECTIONS OF UNDERGROUND PIPELINE ROUTING | 2015 |
|
RU2601651C1 |
SEISMIC-TWO STILTS MOVABLE PIPELINE SUPPORT AND DAMPER FOR A SEISMIC-TWO STILTS MOVABLE PIPELINE SUPPORT | 2015 |
|
RU2601683C1 |
SEISMIC-RESISTANT FIXED PIPELINE SUPPORT, CONNECTION JOINT OF PIPELINE COIL WITH GRILLAGE OF PIPELINE SUPPORT FOR SEISMIC-RESISTANT FIXED PIPELINE SUPPORT AND LONGITUDINAL DAMPER DEVICE FOR SEISMIC-RESISTANT FIXED PIPELINE SUPPORT | 2015 |
|
RU2624681C2 |
SEISMIC RESISTANT FOUR-PILE MOBILE PIPELINE SUPPORT AND DAMPER DEVICE FOR THE SEISMIC RESISTANT FOUR-PILE MOBILE PIPELINE SUPPORT | 2017 |
|
RU2648179C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD FOR RESTORATION OF PROJECTED HEIGHT OF FIXED SUPPORT OF OIL LINE | 2012 |
|
RU2499940C1 |
METHOD OF CONSTRUCTION OF SUBSTRUCTURE FOR CLUSTER DRILLING AND OPERATION OF WELLS OF OIL-GAS FIELDS IN FLOODED ZONES | 2001 |
|
RU2215089C2 |
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE | 2023 |
|
RU2807350C1 |
Authors
Dates
2015-09-20—Published
2014-03-20—Filed