FIELD: construction.
SUBSTANCE: pipeline support comprises interacting movable and fixed parts. The movable part includes a semi-cylindrical location bed with semi-circular stiffening ribs on the outer side of the location bed, detachable half-yokes for fixation of the pipeline in the location bed, side cheeks rigidly welded to the location bed and movably fixed to the support foot by means of a hinged joint. The foot is arranged as capable of sliding movement along the surface of the fixed part of the support. The support unit is a support coupling, freely with a gap installed on two half-rings rigidly connected to a foundation pile, on which a support plate is arranged with a hole corresponding to the inner diameter of the coupling. The plate is connected to the coupling by vertical gussets and horizontal stiffening ribs.
EFFECT: even distribution of load from a pipeline to a fixed part of the support, provision of the possibility to displace a movable part of the pipeline support in the specified design modes.
15 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
SEISMIC-TWO STILTS MOVABLE PIPELINE SUPPORT AND DAMPER FOR A SEISMIC-TWO STILTS MOVABLE PIPELINE SUPPORT | 2015 |
|
RU2601683C1 |
SUSPENSION SUPPORT FOR SECTIONS OF UNDERGROUND PIPELINE ROUTING | 2015 |
|
RU2601651C1 |
SEISMIC RESISTANT FOUR-PILE MOBILE PIPELINE SUPPORT AND DAMPER DEVICE FOR THE SEISMIC RESISTANT FOUR-PILE MOBILE PIPELINE SUPPORT | 2017 |
|
RU2648179C1 |
FIXED SUPPORT OF PIPELINE | 2014 |
|
RU2563094C1 |
METHOD TO INSTALL FIXED SUPPORT INTO DESIGN POSITION WITH POSSIBILITY TO ADJUST HEIGHT POSITION IN PROCESS OF OPERATION | 2014 |
|
RU2572428C2 |
ABOVE GROUND PIPELINE SUPPORT | 2022 |
|
RU2781733C1 |
SEISMIC-RESISTANT FIXED PIPELINE SUPPORT, CONNECTION JOINT OF PIPELINE COIL WITH GRILLAGE OF PIPELINE SUPPORT FOR SEISMIC-RESISTANT FIXED PIPELINE SUPPORT AND LONGITUDINAL DAMPER DEVICE FOR SEISMIC-RESISTANT FIXED PIPELINE SUPPORT | 2015 |
|
RU2624681C2 |
METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL | 2022 |
|
RU2785329C1 |
QUAKEPROOF SUPPORT OF BUILDING | 2010 |
|
RU2440463C2 |
METHOD FOR RESTORATION OF PROJECTED HEIGHT OF FIXED SUPPORT OF OIL LINE | 2012 |
|
RU2499940C1 |
Authors
Dates
2016-01-20—Published
2014-03-20—Filed