FIELD: electricity.
SUBSTANCE: application: in electrical engineering. According to the procedure input is made by at least one wind-driven power plant (32) with the first feeding device (WP1, WP2) at the point of entry to the electric mains (10), and input is made depending on electric parameters of the network (10), and measured values of electric parameters or measured values for determination of electric parameters are recorded at moments intended for measurements with preset time intervals, at that moments intended for measurements are synchronised with external time signal supplied from outside the first feeding device.
EFFECT: ensuring proportional power input to the mains from independent feeding units.
12 cl, 5 dwg
Authors
Dates
2015-10-10—Published
2012-08-14—Filed