FIELD: transportation.
SUBSTANCE: crane contains the vertical tower with the bell on it, the first saddle jib fastened by one end to the bell, and by another one - to the vertical support installed on the vehicle, the cabin with the control panel. The second saddle jib (9) is fixed by one end to the bell (2), and by another one - to the support (10). The sealed container is fixed to the second vertical support (11) and the additional sealed container is made from elastic material (12). The beams (18) and (19) are fixed by one end to the saddle jib (4), and by another end to the saddle jib (9). On the beams the carriage (20) is located. The beam (21) is fixed to the carriage (20). The sealed container from elastic material is connected by hose to the air pump through the hole in its chamber with the second hole closed by the spring-loaded valve with electromagnet.
EFFECT: crane stability improvement.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
TOWER CRANE | 2007 |
|
RU2345946C1 |
TOWER CRANE | 1996 |
|
RU2099273C1 |
TOWER CRANE | 1990 |
|
RU2041155C1 |
AUTOMOTIVE CRANE | 2019 |
|
RU2725343C1 |
DEVICE FOR CONNECTING PIPELINES UNDER ANGLE | 2017 |
|
RU2665839C1 |
APPARATUS FOR ANGULAR JOINING OF PIPELINES | 2003 |
|
RU2244199C1 |
CRANE | 0 |
|
SU1752713A1 |
0 |
|
SU206048A1 | |
CHAMBER FOR WELDING IN INERT GAS | 1995 |
|
RU2076028C1 |
CRANE-LOADER (VERSIONS) | 2006 |
|
RU2317248C2 |
Authors
Dates
2015-10-20—Published
2014-06-16—Filed