FIELD: construction.
SUBSTANCE: method consists in the injection of cold atmospheric air (t<0°C) under the lower edge of ice via holes drilled in it into previously prepared closed areas with lowering of water level during the ebb.
EFFECT: increased bearing capacity of the ice cover.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTING ICE TEMPORARY BRIDGE | 1999 |
|
RU2170790C2 |
METHOD TO INCREASE BEARING CAPACITY OF ICE COVER | 2014 |
|
RU2565710C1 |
ICE CROSSING CONSTRUCTION PROCESS | 2000 |
|
RU2164975C1 |
METHOD TO INCREASE BEARING CAPACITY OF ICE COVER | 2018 |
|
RU2695190C1 |
METHOD TO INCREASE BEARING CAPACITY OF ICE COVER | 2018 |
|
RU2695577C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626855C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2642726C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622956C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622967C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622959C1 |
Authors
Dates
2015-10-20—Published
2014-05-14—Filed