FIELD: construction.
SUBSTANCE: carrying capacity of the crossing ice cover is increased by means of steel pipes lowered vertically to the basin bottom through the through openings formed in the ice cover along both sides of the crossing along its entire length, the bottom end of the pipe being made welded and its upper end projecting over the ice surface. The pipes are made of four parts articulated with each other by three spherical hinges air-permeable in the axial direction of the pipes, wherein the lower part of the pipes lowered to the basin bottom and the upper part emerging from under the ice are installed coaxially, and the other two, equal to each other by the length, at an angle to them.
EFFECT: increasing the carrying capacity.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626851C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622960C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622959C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2642726C1 |
METHOD FOR INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2622967C1 |
METHOD OF INCREASING CAPACITY OF ICE CAP | 2016 |
|
RU2651665C2 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626087C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2642728C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626857C1 |
METHOD OF INCREASING CARRYING CAPACITY OF ICE COVER | 2016 |
|
RU2626855C1 |
Authors
Dates
2017-06-21—Published
2016-04-22—Filed